My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2007-299
CBCC
>
Official Documents
>
2000's
>
2007
>
2007-299
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/22/2016 11:53:04 AM
Creation date
9/30/2015 11:07:22 PM
Metadata
Fields
Template:
Official Documents
Official Document Type
Amendment
Approved Date
09/04/2007
Control Number
2007-299
Agenda Item Number
14.B.3
Entity Name
Geosyntec Consultants, Inc.
Subject
Amendment to Work Order No.4 Services Landfill Lateral Expansion
Area
County Landfill Fafility
Supplemental fields
SmeadsoftID
6544
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
44
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Mr. Himanshu H. Mehta, P.E. <br /> 1 I July 2007 <br /> Page 8 <br /> the desirability of continuing the SWDD practice of separate C&D debris disposal in a dedicated <br /> unlined C&D landfill in comparison with co-disposing it conuningled with MSW in a lined Class <br /> I landfill. Geosyntec performed this task by considering the economic and environmental issues, <br /> and prepared a technical report that summarized the results of the study with conclusions and <br /> recommendations for submittal to the SWDD Board. A copy of this report is included as <br /> Appendix A to this proposal. Therefore, Geosyntec has included a budget estimate for the <br /> preparation of this report, which includes attendance of two review meetings with SWDD. <br /> SCHEDULE <br /> Geosyntec estimates that the scope of work of this amendment would extend the project schedule <br /> by six months. A Substantial Modification Permit Application for the Class I — Segment 3 <br /> landfill lateral expansion will be prepared and submitted to FDEP during this period. <br /> BUDGET ESTIMATE <br /> A budget estimate for the scope of work outlined in Tasks 1 through 6 of this proposal is <br /> summarized in the following table. The budget estimate does not include FDEP permit <br /> application fees. A detailed budget estimate is provided as Attachment 2 . <br /> • Task I — General Consulting/Meeting Support/Project Management $233206 <br /> • Task 2 — Hydrogeological and Geotechnical Investigations S 19,339 <br /> • Task 3 — Design and Permit Application $993648 <br /> • Task 4 — ERP Modification $23 ,706 <br /> • Task 5 — Response to Regulatory Comments $ 18 , 892 <br /> • Task 6 — Feasibility study of Landfill Consolidation $ 18,692 <br /> TOTAL $2031483 <br /> The budget estimate presented in this proposal is based on Geosyntec's understanding of the <br /> project requirements and experience with permitting similar facilities. Geosyntec will not <br /> exceed the budget estimate without prior approval and written authorization from S WDD. <br /> X1_0609MAmendmem to Class 1 landfill Design Work Order.doc <br /> crib nears i scientists I innovators <br />
The URL can be used to link to this page
Your browser does not support the video tag.