Laserfiche WebLink
Table 2 <br /> BUDGET ESTIMATE <br /> DESIGN AND PERMITTING SERVICES <br /> CLASS I LANDFILL EXPANSION, INDIAN RIVER COUNTY, FLORIDA <br /> TASK 02 : HYDROGEOLOGICAL AND GEOTECHNICAL INVESTIGATIONS <br /> ITEM BASIS RATE QUANTITY ESTIMATED <br /> COST <br /> A. Professional Services .'.'; <br /> a. Principal Hr $185 0 $0 <br /> b. Associate Hr $160 10 $1 ,600 <br /> c. Senior Project Engineer Hr 42$1 24 $3,400 ' <br /> d. Project Engineer Hr $109 0 $0 <br /> e. Engineer Hr $89 48 $4,295 <br /> f. Senior Staff Engineer Hr $82 0 $0 <br /> g . Staff Engineer Hr $68 48 $3,287 <br /> Subtotal Professional Services $12,582 <br /> B. Technical/Administrative Services <br /> a. Senior Engineering Technician Hr $95 0 $0 <br /> b. Drafter/CADD Operator/Artist Hr $54 24 $1 ,296 <br /> c. Technical/Administrative Assistant Hr $70 4 $281 <br /> d. Technical Word Processor Hr $66 8 $527 <br /> e. Clerical Hr $42T 12 $507 <br /> Subtotal Technical/Administrative Services $2,611 <br /> C. Reimbursables . . <br /> a. Topographic Survey Subcontractor Lump Sum $500 0 $0 <br /> b. Rotosonic® Drilling Subcontractor Lump Sum $2,500 0 $0 <br /> c. Geotechnical Drilling Subcontractor Lump Sum $14,000 0 $0 <br /> d. Long-Term Monitoring Equipment Lump Sum $1 ,000 1 $1 ,000 <br /> e. Analytical Testing Lump Sum $4,000 0 $0 <br /> f. Geotechnical LaboratoryTesting Lump Sum $3,500 0 $0 <br /> g. Lodging Day $100 5 $500- <br /> h. Per Diem Day $42 5 $210 <br /> i. Vehicle Rental Day $100 5 $500 <br /> j. Communications Fee 3% Labor $0.03 $15,193 $456 <br /> k. CADD Computer System Hr $ 15.00 $24 $360 <br /> I. 8'x11 ' Photocopies Each $0.12 500 $60 <br /> m. CADD Drawings Each $3.00 20 $60 <br /> n. Field Supplies Day $50 20 $1 ,000 <br /> Subtotal Reimbursables $4,146 <br /> TOTAL ESTIMATED BUDGET- .- TASK -62 <br /> F0105361ConceptApplCell 2 Design Budgel_Estimatei .zls GeoSyntec Consutlants <br />