My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2005-287
CBCC
>
Official Documents
>
2000's
>
2005
>
2005-287
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/1/2016 2:07:18 PM
Creation date
9/30/2015 9:03:25 PM
Metadata
Fields
Template:
Official Documents
Official Document Type
Change Order
Approved Date
08/23/2005
Control Number
2005-287
Agenda Item Number
7.I.
Entity Name
Danella Companies, Inc.
Subject
Chesser's Gap Force Main - CR 512 Change Order #01
Area
CR 512
Supplemental fields
SmeadsoftID
5138
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
5
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CM1 z GAP <br /> p <br /> 790 N.E. 48th Street - Pompano Beach, Florida 33064 <br /> .caa+aerrrar«rr�xs. raivv+c_ <br /> Indian River County Department of Utilities <br /> COST ESTIMATE and CONTRACTOR'S BID ITEM LIST <br /> Project: IRC - Chesser's Gap 6" Force Main CHANGE ORDER <br /> Description: WIP #471-26836-044699 <br /> 5-Jul-05 LABOR COSTS <br /> Bid Bid Item Estimated Unit of Labor Unit Total Labor <br /> Item No. Description Quantity , Measure Price Price <br /> 77 Mobilization 1 4% 642 .30 <br /> 78 Demobilization 1 1 % 160.58 <br /> 79 Maintenance of Traffic 1 1 % 160. 58 <br /> 04c Install 8 " HDPE Horiz. Directional Drill 400 LF $22 .00 8,800.00 <br /> 06 Install MRJDI Fittings 0. 50 Tons $ 1 ,665 .001 832 .50 <br /> 31f Install 8 " PVC Force Main 10 LF $6 .50 65 .00 <br /> 13c Ta 8" Main for Installation of Assembly 1 EA $650.00 650.00 <br /> Ila Install Wet Ta Assembly 8 " & 8" 1 EA $900.00 900.00 <br /> 9 Make Connections to Existing 1 EA. $795 .00 795 .00 <br /> Main/Structure <br /> 44 Core Drill MH & Install Expansion Boot 1 EA. $ 550 .00 550.00 <br /> 72 Load and Haul Debirs 3 CY $350.00 1 ,050 .00 <br /> 23 Potholes 6 EA. $200.00 1 ,200 .00 <br /> 73a Topsoil & Sod 450 SY $2 .70 1 ,215 .00 <br /> Subtotal Subtotal Sewer System Labor 16,057 .50 <br /> Subtotal Subtotal Sewer System Labor, Mob., 963 .46 <br /> Demob . <br /> SubTotal Labor Cos $17,020.96 <br /> TOTAL PROJECT COST <br /> CMsw Gap MV Ab <br />
The URL can be used to link to this page
Your browser does not support the video tag.