Laserfiche WebLink
CM1 z GAP <br /> p <br /> 790 N.E. 48th Street - Pompano Beach, Florida 33064 <br /> .caa+aerrrar«rr�xs. raivv+c_ <br /> Indian River County Department of Utilities <br /> COST ESTIMATE and CONTRACTOR'S BID ITEM LIST <br /> Project: IRC - Chesser's Gap 6" Force Main CHANGE ORDER <br /> Description: WIP #471-26836-044699 <br /> 5-Jul-05 LABOR COSTS <br /> Bid Bid Item Estimated Unit of Labor Unit Total Labor <br /> Item No. Description Quantity , Measure Price Price <br /> 77 Mobilization 1 4% 642 .30 <br /> 78 Demobilization 1 1 % 160.58 <br /> 79 Maintenance of Traffic 1 1 % 160. 58 <br /> 04c Install 8 " HDPE Horiz. Directional Drill 400 LF $22 .00 8,800.00 <br /> 06 Install MRJDI Fittings 0. 50 Tons $ 1 ,665 .001 832 .50 <br /> 31f Install 8 " PVC Force Main 10 LF $6 .50 65 .00 <br /> 13c Ta 8" Main for Installation of Assembly 1 EA $650.00 650.00 <br /> Ila Install Wet Ta Assembly 8 " & 8" 1 EA $900.00 900.00 <br /> 9 Make Connections to Existing 1 EA. $795 .00 795 .00 <br /> Main/Structure <br /> 44 Core Drill MH & Install Expansion Boot 1 EA. $ 550 .00 550.00 <br /> 72 Load and Haul Debirs 3 CY $350.00 1 ,050 .00 <br /> 23 Potholes 6 EA. $200.00 1 ,200 .00 <br /> 73a Topsoil & Sod 450 SY $2 .70 1 ,215 .00 <br /> Subtotal Subtotal Sewer System Labor 16,057 .50 <br /> Subtotal Subtotal Sewer System Labor, Mob., 963 .46 <br /> Demob . <br /> SubTotal Labor Cos $17,020.96 <br /> TOTAL PROJECT COST <br /> CMsw Gap MV Ab <br />