My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2004-018B
CBCC
>
Official Documents
>
2000's
>
2004
>
2004-018B
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/18/2016 1:57:48 PM
Creation date
9/30/2015 7:16:51 PM
Metadata
Fields
Template:
Official Documents
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
186
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Indian River County Mitigation Reef Design for Sectors 1 &2 <br /> Addendum #3 <br /> Page 3 of 7 <br /> ALTERNATE BID <br /> Indian River County, as OWNER, requests that all BIDDERS complete both the Base Bid (Bid <br /> Form as provided on page BP4 of the issued Documents and clarified below) and the Alternate <br /> Bid Form herein attached and made part of this Addendum. BIDDER understands and <br /> acknowledges, by completion of both Bid and Alternate Bid Forms, that OWNER may, at the <br /> sole discretion of the OWNER, award a contract to the lowest responsive, responsible BIDDER <br /> on the basis of either the Total Base Bid or the Total Alternate Bid. <br /> The Base Bid shall require operation from dawn to dusk only with all offshore construction <br /> activity suspended during nighttime hours. <br /> The Alternate Bid shall allow for 24 hour operation with staging and construction activity <br /> occurring continuously throughout the night time hours. <br /> CONTRACTOR understands that any and all lighting used during nighttime hours shall be <br /> shielded as detailed in the applicable permits. Additionally, equipment shall be properly <br /> maintained to reduce noise. All conditions specified in Section 13d of FDEP Permit No . <br /> 0166929-001 -JC and those outlined in the Contract Documents shall be fully and completely <br /> adhered to for the duration of the project (including during mobilization and demobilization) . <br /> In addition, from March 1 through October 31 , stationary lighting on in-water equipment shall be <br /> minimized through reduction, shielding, lowering, and appropriate placement of lights to <br /> minimize illumination of the nesting beach and water. CONTRACTOR shall understand that <br /> FWC staff or designated personnel will conduct a lighting inspection prior to any mitigation <br /> work. This inspection shall occur from the beach once any vessels or work platforms have been <br /> positioned and are operating adjacent to shore . If the inspection documents lights that could <br /> interfere with adult or hatchling marine turtles on the nesting beach, the CONTRACTOR shall, <br /> at their expense, modify the problem lights to resolve any such interference. Such modifications <br /> shall include, but not be limited to , shielding, changing light sources or bulb types, focusing the <br /> lights, or lowering the lights as approved by FWC and DEP staff. <br /> C Documents and Settings%jonathang%ocat SettingATemponvy Internet FileAOLUDSectors 12Id itigation Reef Bid Addendum #3.doc <br />
The URL can be used to link to this page
Your browser does not support the video tag.