Laserfiche WebLink
INDIAN RIVER COUNTY MITIGATION REEF PROJECT <br /> TECHNICAL AND ENVIRONMENTAL SPECIFICATIONS <br /> by the COUNTY to construct the reef, as required , in a safe and environmentally sound <br /> manner. <br /> 18 . 17 Fiber Optic Cables . A cable avoidance buffer zone located north of the <br /> construction Mitigation Area has been established with the intent of prohibiting <br /> CONTRACTOR access in the area of all known AT&T fiber optic cables in the vicinity. <br /> The area is identified as Cable Avoidance Buffer Area on Sheets 1 , 2 and 4 of the <br /> Construction Plans . UNDER NO CIRCUMSTANCES shall the CONTRACTOR or <br /> Subcontractors work or anchor within the Cable Avoidance Buffer Area . Any damage <br /> done to fiber optic cables or any devices buried or unburied within this avoidance area <br /> by CONTRACTOR or Subcontractor equipment, materials or personnel shall be the sole <br /> responsibility of the CONTRACTOR . The COUNTY and the ENGINEER shall not be <br /> held liable in any way for damages to cables or devices within this area . All fines or fees <br /> incurred within or related to the Cable Avoidance Buffer Area shall be the sole <br /> responsibility of the CONTRACTOR . <br /> 17 . 17 Nearshore Exposed Hardbottom . In an effort to minimize the impacts to <br /> nearshore hardbottom , an area of known exposed hardbottom has been identified on <br /> Sheets 1 , 2 and 4 of the construction plans . The CONTRACTOR and all Subcontractors <br /> shall not work or anchor within these areas . Any applicable fines or fees resulting from <br /> CONTRACTOR activity within these areas shall be the sole responsibility of the <br /> contractor. Due to the ephemeral nature of the hardbottom in the area the <br /> CONTRACTOR must take care not to damage any recently exposed and/or Ephemeral <br /> Hardbottom not identified on the plans — this exposed and/or Ephemeral Hardbottom <br /> may be located anywhere within or adjacent to the Project Area . The CONTRACTOR <br /> shall be held responsible for damage done to the existing exposed and/or Ephemeral <br /> Hardbottom by the CONTRACTOR or Sub-contractors . <br /> 17 . 18 County Acceptance . Following reef construction , inspection and acceptance of <br /> the constructed Mitigation Area by the COUNTY, the CONTRACTOR shall remove any <br /> and all mooring lines and construction buoys . <br /> 18 . MATERIAL PLACEMENT <br /> The Contractor shall place individual material units consisting of limestone or coquina <br /> boulders of irregular shape as shown in the Plans . The total acreage of artificial reef is <br /> approximately 5 . 24 acres , which will simulate existing conditions of the reef areas that <br /> are being replaced by construction of the Mitigation Area . Reef material shall be placed <br /> such that 120-foot (length ) by 50-foot (width ) rectangles are constructed and such that <br /> the rectangles are oriented in the shore perpendicular position , as indicated in the <br /> Construction Plans . The spaces between each of the rectangles shall be 10 feet in width <br /> and 120 feet in length , also oriented in the shore perpendicular position . A total of 36 <br /> High Relief High Complexity rectangular units and 2 Low Relief Low Complexity <br /> rectangular units shall be constructed . <br /> Each individual material limestone or coquina boulder ( stone ) shall be placed with its <br /> long axis perpendicular to the shoreline for stability . Each individual material unit shall <br /> TS- 14 <br />