Laserfiche WebLink
EQUIPMENT SCHEDULE 1 : BARGE AND EQUIPMENT <br /> FORM TO BE SUBMITTED WITH THE BID <br /> This schedule shall include equipment owned and/or operated by the BIDDER and by any Subcontractor responsible for more than <br /> five <br /> percent (5 %) of the total work . Indicate on the form below if the equipment is owned or operated by the BIDDER or Subcontractor. <br /> Attach additional <br /> sheets if necessary. <br /> OWN OPERATOR NO , TYPE CAPACITY MANUFACTURER AGE & CONDITION LOCATION <br /> NOTES : In preparing the above tabulation, the BIDDER shall insert the following information under the appropriate heading, using a <br /> separate line for each major item and <br /> additional pages, if necessary. <br /> A . Number: Name of vessel or identifying number. <br /> B . Type : Under this heading, give descriptions . Include minimum and maximum working draft. <br /> C . Electronic Monitoring (Positioning) Equipment: State the manufacturer's name, description of equipment, and methods of interfacing <br /> (if required) and accuracy. <br /> D . List and describe any other equipment that will be used aboard barges and vessels for this project, such as backhoes, cranes, <br /> forklifts, front-end loaders, etc. <br /> INFORMATION REQUIRED OF BIDDERS <br /> I-4 <br />