My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2004-018B
CBCC
>
Official Documents
>
2000's
>
2004
>
2004-018B
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/18/2016 1:57:48 PM
Creation date
9/30/2015 7:16:51 PM
Metadata
Fields
Template:
Official Documents
Official Document Type
Contract
Approved Date
01/20/2004
Control Number
2004-018B
Agenda Item Number
11.I.2
Entity Name
Applied Technology & Management
Subject
Contract Specifications
Mitigation Reef Design
Area
Ambersand Beach Sectors 1 & 2
Bid Number
6031
Archived Roll/Disk#
3209
Supplemental fields
SmeadsoftID
3595
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
186
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
r <br /> Indian River County Mitigation Reef Design for Sectors 1 &2 <br /> Addendum #2 <br /> Page 2 of 5 <br /> INTRODUCTION TO BIDDER <br /> Amend Text on Page IB-2 of Section H Introduction to Bidder under 2 . ENGINEER <br /> from: <br /> "ENGINEER: <br /> Applied Technology & Management, Inc. <br /> 400 S . Australian Avenue, Suite 855 <br /> West Palm Beach, FL 33401 -5045 <br /> Michael R. Barnett, P.E. <br /> (561 ) 659-0041 Ext, 15 <br /> Fax: (561 ) 659-3733 " to read : <br /> "ENGINEER: <br /> Applied Technology & Management, Inc. <br /> 400 S. Australian Avenue, Suite 855 <br /> West Palm Beach, FL 33401 -5045 <br /> Wendy L. Smith, P . E. <br /> (561 ) 659-0041 <br /> Fax: (561 ) 659-3733" <br /> TECHNICAL AND ENVIRONMENTAL SPECIFICATIONS <br /> Add to the end of Section 12. 1 Contract Material, under Section 12 MATERIALS <br /> REQUIRED on Page TS-7 OF THE TECHNICAL AND ENVIRONMENTAL <br /> SPECIFICATIONS : <br /> "Foreign sources of limestone will be permitted for use in this project <br /> provided all of the specifications in the contract documents are met <br /> including the requirements for material integrity, quality, size, and method <br /> of material quantity certification. All necessary legal expenses associated <br /> with the importation of material will be the responsibility of the <br /> contractor. " <br /> Amend Text on Pages TS-7 through TS -8 OF THE TECHNICAL AND <br /> ENVIRONMENTAL SPECIFICATIONS, Section 13 . 1 PRIMARY EQUIPMENT <br /> REQUIRED, Tug, barge(s), and crew from: <br /> "The tug, barge, and all other equipment used must feature sufficiently shallow drafts to <br /> avoid any contact whatsoever with exposed and/or Ephemeral Hardbottom in the Project <br /> 2 <br />
The URL can be used to link to this page
Your browser does not support the video tag.