My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2004-018B
CBCC
>
Official Documents
>
2000's
>
2004
>
2004-018B
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/18/2016 1:57:48 PM
Creation date
9/30/2015 7:16:51 PM
Metadata
Fields
Template:
Official Documents
Official Document Type
Contract
Approved Date
01/20/2004
Control Number
2004-018B
Agenda Item Number
11.I.2
Entity Name
Applied Technology & Management
Subject
Contract Specifications
Mitigation Reef Design
Area
Ambersand Beach Sectors 1 & 2
Bid Number
6031
Archived Roll/Disk#
3209
Supplemental fields
SmeadsoftID
3595
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
186
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
reference be specific or by implications, shall mean the latest standard specification, manual, code or Laws <br /> or Regulations in effect at the time of opening of Bids (or, on the Effective Date of the Agreement if there <br /> were no Bids), except as may be otherwise specifically stated. However, no provision of any referenced <br /> standard specification, manual or code (whether or not specifically incorporated by reference in the <br /> Contract Documents) shall be effective to change the duties and responsibilities of OWNER, <br /> CONTRACTOR or ENGINEER, or any of their consultants, agents or employees from those set forth in <br /> the Contract Documents, nor shall it be effective to assign to ENGINEER, or any of ENGINEER' S <br /> consultants, agents or employees, any duty or authority to supervise or direct the furnishing or performance <br /> of the Work or any duty or authority to undertake responsibility contrary to the provisions of paragraph <br /> 9. 15 or 9. 16. Clarifications and interpretations of the Contract Documents shall be issued by ENGINEER <br /> as provided in paragraph 9.4 . <br /> 3 .3 If, during the performance of the Work, CONTRACTOR finds a conflict, error or discrepancy in the <br /> Contract Documents, CONTRACTOR shall so report to ENGINEER in writing at once and before <br /> proceeding with the Work affected thereby and shall obtain a written interpretation or clarification from <br /> ENGINEER; however, CONTRACTOR shall not be liable to OWNER or ENGINEER for failure to report <br /> any conflict, error or discrepancy in the Contract Documents unless CONTRACTOR had actual knowledge <br /> thereof or should reasonably have know thereof. <br /> Amending and Supplementing Contract Documents : <br /> 3 .4 The Contract Documents may be amended to provide for additions, deletions and revisions in the Work or <br /> to modify the terms and conditions thereof in one or more of the following ways : <br /> 3 .4 . 1 A formal Written Amendment, <br /> 3 .4 .2 A Change Order (pursuant to paragraph 10 .4), or <br /> 3 .4 . 3 A Work Directive Change (pursuant to paragraph 10. 1 ) . <br /> As indicated in paragraphs 11 .2 and 12 . 1 , Contract Price and Contract Time may only be changed by a <br /> Change Order or a Written Amendment. <br /> 3 . 5 In addition, the requirements of the Contract Documents may be supplemented, and minor variations and <br /> deviations in the Work may be authorized, in one or more of the following ways : <br /> 3 . 5 . 1 A Field Order (pursuant to paragraph 9 . 5), <br /> 3 . 5 .2 ENGINEER' s review of a shop drawing or sample (pursuant to paragraphs 6.32 and 6 . 33), or <br /> 3 . 5 . 3 ENGINEER' s written interpretation or clarification (pursuant to paragraph 9 .4) . <br /> Reuse of Documents : <br /> 3 . 6 Neither CONTRACTOR nor any Subcontractor or Supplier or other person or organization performing or <br /> furnishing any of the Work under a direct or indirect contract with OWNER shall have or acquire any title to or <br /> ownership rights in any of the Drawings, Specifications or other documents (or copies of any thereof) prepared <br /> by or bearing the seal of ENGINEER; and they shall not reuse any of them on extensions of the Project or any <br /> other project without written consent of OWNER and ENGINEER and specific written verification or <br /> adaptation by ENGINEER. <br /> GENERAL CONDITIONS GC5 <br />
The URL can be used to link to this page
Your browser does not support the video tag.