Laserfiche WebLink
DRAFT SCOPE OF WORK <br /> Indian River County Mitigation Reef = Sectors 1 & 2 <br /> Construction Phase Services and Additional Sectors 1 & 2 Post= <br /> Construction Physical Monitoring <br /> Introduction : <br /> The Indian River County has proposed to create a total of 5 . 24 acres of mitigative reef <br /> habitat (including one acre of sandy area as required by FDEP Permit 0166929-001 -JC) . <br /> The mitigation will consist of 0 . 28 acres of Low Complexity-Low Relief ( LCLR) reef and <br /> 4 . 96 acres of High Complexity-High Relief ( HCHR) reef as detailed in the " Indian River <br /> County Sectors 1 &2 Beach Restoration Project Mitigation Plan " prepared in October <br /> 2002 by Indian River County Coastal Engineering Division and Applied Technology and <br /> Management , Inc. <br /> Applied Technology and Management , Inc. (ATM) proposes the herein described Scope <br /> of Work to assist Indian River County (COUNTY) with the professional coastal <br /> engineering services for the County Mitigation Reef Construction Phase . <br /> TASK 1 : INSPECTION REVIEW WITH COUNTY AND PRE -CONSTRUCTION <br /> CONFERENCE <br /> ATM will prepare for and one ATM engineer will participate with the COUNTY in one ( 1 ) <br /> meeting prior to the start of construction and prior to the pre-construction conference (to <br /> be held on the same day) . This meeting will include the participation of COUNTY <br /> inspectors and will be held with the purpose of providing the inspectors with information <br /> on the Mitigation Reef construction project and details on what they should include as <br /> part of their daily supervision of the project including data collection . <br /> ATM will prepare for and one ATM engineer will participate with the COUNTY and <br /> COUNTRACTOR in one ( 1 ) pre-construction conference (prior to Contractor mobilization <br /> to the project site) in order to address questions regarding the interpretation of the <br /> project plans and specifications . ATM will be responsible for preparing the agenda and <br /> chairing the meeting , and preparing and distributing the minutes to attendees following <br /> the meeting . <br /> TASK 2 : PERIODIC SITE INSPECTIONS <br /> The construction phase of this project will begin with the award of the contract . During <br /> the construction phase of the project, one ATM engineer will provide construction <br /> services during two site visits . It is explicitly understood that the COUNTY staff shall <br /> furnish daily supervision and inspection of the project, and County staff will interact <br /> directly with the CONTRACTOR as the owner of the Mitigation Reef project. <br /> At each of the two (2 ) site visits , ATM will : <br /> • Supervise the required drop tests — occurring on the day of the field visit . <br /> Requirements for drop tests are included in the Indian River County Mitigation <br /> Reef Project Technical and Environmental Specifications . The ATM engineer <br /> shall also provide a cursory inspection of construction materials present while on <br /> C:\Documents and SettingsVonathang\Local Settings\Temporary Internet Files\OLK2E\Indian River County Mitigation Construction Scope of Work 2-04- 1 <br /> 04. DOC <br />