Laserfiche WebLink
between seasons, sites, and distances offshore. For seasonal comparisons and analyses , project <br /> site and control site will be pooled . <br /> Task 3 Aerial Photography <br /> This task allows for the collection , rectification and geo-referencing of orthogonal aerial <br /> photography from R-94 through R- 112 per the DEP-approved Physical Monitoring Plan <br /> (September 1 , 2006). To provide the County with reduced costs, aerial photographs collected <br /> under this work order are considered as an add-on to the DEP-required aerial photography for <br /> physical monitoring Sectors 1 & 2 (Work Order 11 ); thus, reconnaissance flights are not included <br /> in this scope . When the aerial photographs for Sectors 1 & 2 are collected , Sector 7 photographs <br /> will be subsequently acquired during the same flight. <br /> ATM will provide the County with a set of aerial photographs and digital copies (with world files) of <br /> the aerials in TIF format. <br /> Task 4 Borrow Area Hydrographic Survey <br /> ATM will utilize the survey data collected as part of the Sectors 1 & 2 post-project monitoring <br /> (Work Order 11 ), which is incompliance with the DEP-approved Physical Monitoring Plan . ATM <br /> will provide the County with an xyz data file and drawings ( 11x17 format) showing the survey data <br /> and bathymetric contours. <br /> Task 5 Beach Profile Survey <br /> Morgan & Eklund will perform the beach profile survey data collection and data reduction . Beach <br /> profile will include R-94 through R-112 including half stations from R-99 to R-101 and from R-106 <br /> to R-108 and quarterly stations between R-101 and R- 106 . All data collected will be accordance <br /> with the DEP-approved Physical Monitoring Plan . ATM will review the provide necessary project <br /> coordination with the Morgan & Eklund , provide the County with beach profile data in ASCII file <br /> format , CAD drawings, and drawings ( 11x17 format) signed by the surveyor. <br /> Task 6 Physical Monitoring Report <br /> ATM will analyze the data and prepare a physical monitoring report per the DEP-approved <br /> Physical Monitoring Plan . The report will include reporting of the pre-and post-construction <br /> surveys of the beach profiles and borrow site . ATM will analyze the data for placed sand , <br /> shoreline and volume changes and the post-project condition of the borrow site . ATM will provide <br /> the FDEP with aerial photography (rectified and geo-referenced under a separate work order) . <br /> ATM will prepare the 1 -Year Post-Construction Physical Monitoring Report as necessary. The <br /> County will provide ATM with comments to a draft version , and ATM will distribute the report as <br /> necessary. <br /> ATM will provide the County with one draft report for review, and distribute final copies to the <br /> County and regulatory agencies. <br /> Task 7 Agency Coordination and Project Administration <br /> Under this task, ATM will coordinate with federal and state regulatory agencies on key project <br /> issues and overall satisfaction of permit-required submittals. Quality control and quality <br /> assurance will ensure that all submittals and agency coordination meet ATM ' s and the County's <br /> standards for reporting . All documents will be peer-reviewed internally by ATM staff, and provided <br /> to the County for comment. <br />