My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2008-395
CBCC
>
Official Documents
>
2000's
>
2008
>
2008-395
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/20/2016 9:28:47 AM
Creation date
10/1/2015 1:09:07 AM
Metadata
Fields
Template:
Official Documents
Official Document Type
First Amendment
Approved Date
12/02/2008
Control Number
2008-395
Agenda Item Number
8.R.
Entity Name
Arcadis U.S. Inc.
Subject
Amendment No. 1 Services
Area
20th Ave. SW, 25th St. to 21st St. SW
Supplemental fields
SmeadsoftID
8192
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
10
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
ca- <br /> Board of County Commissioners <br /> 180127th Street <br /> Vero Beach, Florida 32960 <br /> Telephone : (772) 567=8000 <br /> FAX : (772) 778-9391 <br /> 20TH AVENUE SW - 25TH STREET TO 21ST STREET SW <br /> AMENDMENT NO , 1 <br /> TO THE <br /> PROFESSIONAL CIVIL ENGINEERING SERVICES AGREEMENT <br /> WITH <br /> ARCADIS U . S. , INC . <br /> This Amendment No. 1 to the Professional Civil Engineering Services Agreement with <br /> Arcadis U . S . , Inc . is in accordance with the existing AGREEMENT dated December 13 , 2005 <br /> and the extension thereof, between Arcadis U . S . , Inc . ( ENGINEER) and Indian River County <br /> (COUNTY) . <br /> This Amendment No . 1 amends the agreement as follows : <br /> SECTION I — PROJECT LIMITS <br /> Consultant services are required for the preparation of plans for the design of 20th Avenue from <br /> 25th Street SW to 21 gt Street SW. <br /> SECTION II — SCOPE OF SERVICES <br /> The scope of services for this Amendment No . 1 is to perform the following tasks as requested <br /> by the County : <br /> 1 . Preparation of plans for the construction of a stormwater drainage pond on the Falcon <br /> Trace site <br /> 2 . Preparation of stormwater drainage calculations to determine the required pond size , <br /> water surface elevations , and water quality treatment and permanent pool size <br /> requirements . <br /> 3 . Meeting with the St . Johns River Water Management District (SJRWMD) to confirm the <br /> permit requirements for the project . <br /> 4 . Preparation and submission of permit application packages to the SJRWMD and the <br /> Indian River Farm Water Control District . <br /> SECTION III = TIME FOR COMPLETION <br /> Supplemental tasks shall be completed within 30 business days from the date of execution <br /> of this Amendment No . 1 to the Professional Civil Engineering Services Agreement with <br /> Arcadis U . S . , Inc . . <br /> CADocuments and Settings\hdeibel\Local Settings\Temporary Internet Files\Content.Outlook\41 YHPOTT\Amendment No 1 Arcadis 11 - 17-08 <br /> (2) . doc <br />
The URL can be used to link to this page
Your browser does not support the video tag.