My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2009-037
CBCC
>
Official Documents
>
2000's
>
2009
>
2009-037
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/2/2016 12:16:16 PM
Creation date
10/1/2015 3:16:04 AM
Metadata
Fields
Template:
Official Documents
Official Document Type
Work Order
Approved Date
02/10/2009
Control Number
2009-037
Agenda Item Number
8.G.
Entity Name
Ardaman & Assoc.
Subject
Work Order No.5 Falcon Trace Project Entrance
Area
17th Lane SW, 20th Ave., 17th Lane SW, 20th Ave.
Project Number
2008071
Supplemental fields
SmeadsoftID
10451
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
11
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
EXHIBIT " A" <br /> ARDAMAN & ASSOCIATES , INC . <br /> FEE SCHEDULE <br /> INDIAN RIVER COUNTY <br /> GEOTECHNICAL AND ENVIRONMENTAL ENGINEERING <br /> AND CONSTRUCTION MATERIALS TESTING SERVICES <br /> ( October 1 , 2008 through September 30 , 2009) <br /> CONCRETE SAMPLING AND TESTING <br /> Cylinder samples ( up to 4 cylinders per set) : molding <br /> curing , and strength testing (ASTM C -31 and C -39) . <br /> Cylinders shall be left in a place provided by the <br /> Contractor, covered with plastic caps and attempts <br /> made to provide shade thereon . If temperature of <br /> the air is critical to first 24 hours (during field curing ) , <br /> equipment to maintain such controls shall be provided <br /> by others . $80 . 00/set <br /> Additional cylinders $ 15 . 00/cylinder <br /> Technician time due to construction delays in excess <br /> of 1 . 0 hour on-site on the date cylinders are made $44 . 00/hour <br /> Technician time transporting cylinders from site to office <br /> if no other work is required $44 . 00/hour <br /> Curing and strength testing samples delivered to our <br /> laboratory (ASTM C-39 ) $ 15 . 00/cylinder <br /> Continuous monitoring of concrete placement and/or <br /> extra slump and temperature tests , technician time $44 . 00/hour <br /> Slump tests (ASTM C - 143) $ 15 . 00/test <br /> Air Entrainment (ASTM C - 173 ) $30 . 00/test <br /> Unit weight <br /> $ 35 . 00/test <br /> Yield tests $35 . 00/test <br /> Verification of mix design $225 . 00/each <br /> Fineness modules $44 . 00/each <br /> Plant control $44 . 00/hour <br /> Concrete blocks . Strength tests (determined by gross area ) $30 . 00/block <br /> Concrete blocks . Absorption and strength tests ( net area ) $ 125 . 00/set of 3 <br /> Block Prism Assembly $220 . 00/set of 3 <br /> Flexural Strength Beams ( up to 3 beams ) $ 30 . 00 each additional beam $ 150 . 00/set of 3 <br /> Test beams made by others $ 50 . 00/each <br /> Grout Prisms 3/set ( blocks supplied by others ) $75 . 00/set <br /> Marsh Funnel Viscosity $ 35 . 00/test <br /> SAMPLING AND TESTING OF IN -PLACE CONCRETE/SOIL CEMENT <br /> Coring and testing of cored samples : <br /> Technician time (two technicians may be required ) $44 . 00/hour <br /> Mobilization of coring equipment <br /> With power su ppl ied $ 125 . 00/trip <br /> Without power supplied $ 100 . 00/trip <br /> Trimming , capping and strength test (ASTM C -42 ) $ 30 . 00/core <br /> Depth measurement $ 15 . 00/core <br /> Swiss Hammer <br /> Mobilization of equipment $ 50 . 00/trip <br /> Technician time $ 52 . 00/ hour <br /> ' Ardarnan & Associates , Inc . <br />
The URL can be used to link to this page
Your browser does not support the video tag.