My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2009-037
CBCC
>
Official Documents
>
2000's
>
2009
>
2009-037
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/2/2016 12:16:16 PM
Creation date
10/1/2015 3:16:04 AM
Metadata
Fields
Template:
Official Documents
Official Document Type
Work Order
Approved Date
02/10/2009
Control Number
2009-037
Agenda Item Number
8.G.
Entity Name
Ardaman & Assoc.
Subject
Work Order No.5 Falcon Trace Project Entrance
Area
17th Lane SW, 20th Ave., 17th Lane SW, 20th Ave.
Project Number
2008071
Supplemental fields
SmeadsoftID
10451
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
11
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
EXHIBIT " A" <br /> ARDAMAN & ASSOCIATES , INC . <br /> FEE SCHEDULE <br /> INDIAN RIVER COUNTY <br /> GEOTECHNICAL AND ENVIRONMENTAL ENGINEERING <br /> AND CONSTRUCTION MATERIALS TESTING SERVICES <br /> ( October 1 , 2008 through September 30 , 2009) <br /> MOBILIZATION AND DEMOBILIZATION <br /> • Men and Equipment $250 . 00 <br /> • Portable Barge Per Job $ 5 , 000 . 00 Minimum <br /> STANDARD DRILLING <br /> All Terrain Vehicle Add ' I Price Per LF $ 1 . 50 <br /> Auger Borings (4- inch ) Per Lineal Foot $ 9 . 00 <br /> Wash Borings - Cuttings Only ( up to 3 inch ) <br /> • Soil drilling Per Lineal Foot $8 . 00 <br /> • Rock drilling Per Lineal Foot $ 12 . 00 <br /> Standard Penetration Test ( SPT) Borings <br /> (ASTM D - 1586 ) in soil ( N -values < 50 ) : <br /> • from surface to 25 feet Per Lineal Foot $ 12 . 00 <br /> • from 25 feet to 50 feet Per Lineal Foot $ 13 . 00 <br /> • from 50 feet to 100 feet Per Lineal Foot $ 14 . 50 <br /> • from 100 feet to 125 feet Per Lineal Foot $ 18 . 00 <br /> • from 125 feet to 150 feet Per Lineal Foot $22 . 00 <br /> Standard Penetration Test ( SPT) Borings in <br /> high resistance soil /rock ( N -values > 50 ) Add 'I Price Per LF $3 . 50 <br /> Furnish , Install , and Remove Casing (up to 4- inch ) : <br /> • from surface to 50 feet Per Lineal Foot $ 7 . 50 <br /> • from 50 feet to 100 feet Per Lineal Foot $9 . 00 <br /> • from 100 feet to 150 feet Per Lineal Foot $ 10 . 50 <br /> Drilling (Time Basis )/2 man-crew Per Crew- Hour $ 145 . 00 <br /> Drilling (Time Basis )/3 man-crew Per Crew- Hour $ 170 . 00 <br /> Support Water Truck (Time Basis) Per Day $ 120 . 00 <br /> Rock Coring ( N or H size ) <br /> • from surface to 50 feet Per Lineal Foot $26 . 00 <br /> • from 50 feet to 100 feet Per Lineal Foot $28 . 00 <br /> • from 100 feet to 150 feet Per Lineal Foot $32 . 00 <br /> Field Permeability Per Test $350 . 00 <br /> SAMPLING <br /> Additional SPT Sampling : <br /> • from 10 feet to 25 feet Per Additional Sample $23 . 00 <br /> • from 26 feet to 50 feet Per Additional Sample $26 . 00 <br /> • from 51 feet to 100 feet Per Additional Sample $29 . 00 <br /> • from 101 feet to 125 feet Per Additional Sample $34 . 00 <br /> • from 126 feet to 150 feet Per Additional Sample $ 39 . 00 <br /> Undisturbed Samples : <br /> • Shelby Tube Per Sample $ 100 . 00 <br /> • Fixed - Piston Shelby , Osterberg , Pitcher Per Sample $ 110 . 00 <br /> SOUNDINGS <br /> Electric Dutch Cone Soundings Per Lineal Foot $9 . 50 <br /> Piezocone Soundings Per Lineal Foot $ 10 . 50 <br /> Muck Probing /Clay Sampling Per Crew Hour $ 120 . 00 <br /> Cone/Piezoprobe Soundings (Time Basis ) Per Crew Hour $ 170 . 00 <br /> Piezoprobe Dissipation Monitoring Per Crew Hour $ 130 . 00 <br /> OTHER CHARGES <br /> Clearing Difficult Access , Hole Location and Set- Up Per Crew- Hour $ 125 . 00 <br /> Standby Time Per Crew- Hour $ 125 . 00 <br /> Piezometer and Well Installation ( plus materials ) Per Crew- Hour $ 140 . 00 <br /> Bore Hole Grouting and Sealing ( plus materials ) Per Crew- Hour $ 140 . 00 <br /> Well Clearing / Sensitivity/Water Level Per Crew- Hour $ 125 . 00 <br /> Air Boat Use Per Day $ 300 . 00 <br /> Instrumentation Unit Use Per Day $ 150 . 00 <br /> terial Per Job At Cost + 12 % <br /> AMWg �� ��j & Associates , Inc . Normal drilling rates times 1 . 5 <br /> V Borings Norm �ll drilling rates times 1 . 5 <br />
The URL can be used to link to this page
Your browser does not support the video tag.