My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2008-369A
CBCC
>
Official Documents
>
2000's
>
2008
>
2008-369A
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/18/2016 2:21:02 PM
Creation date
10/1/2015 1:06:39 AM
Metadata
Fields
Template:
Official Documents
Official Document Type
Agreement
Approved Date
11/18/2008
Control Number
2008-369A
Agenda Item Number
8.M.
Entity Name
Ardaman & Associates Agreement
Subject
Services Agreement 2008-2009
Supplemental fields
SmeadsoftID
8103
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
16
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
EXHIBIT " A" <br /> ARDAMAN & ASSOCIATES , INC . <br /> FEE SCHEDULE <br /> INDIAN RIVER COUNTY <br /> GEOTECHNICAL AND ENVIRONMENTAL ENGINEERING <br /> AND CONSTRUCTION MATERIALS TESTING SERVICES <br /> (October 1 , 2008 through September 30 , 2009) <br /> GENERAL FIELD EQUIPMENT : <br /> Field Gas Chromatograph Per Day $300 . 00 <br /> Data Logger Per Day $240 . 00 <br /> Organic Vapor Analyzer (OVA 128 or Gastech) Per Day $ 120 . 00 <br /> Photo Ionization Detector ( Photovac Tip) Per Day $ 110 . 00 <br /> Generator Per Day $95 . 00 <br /> Steam Cleaner Per Day $ 100 . 00 <br /> Surveying Equipment (Water Table Elevations) Per Day $55 . 00 <br /> Centrifugal Development Pump Per Day $50 . 00 <br /> Submersible Development Pump Per Day $ 100 . 00 <br /> Peristaltic Purging Pump Per Day $40 . 00 <br /> Magnetometer Per Day $35 . 00 <br /> Product/Water Interface Probe Per Day $35 . 00 <br /> pH/Conductivity Meter Per Day $25 . 00 <br /> Turbidity Meter Per Day $55 . 00 <br /> Water Level Indicator Per Day $20 . 00 <br /> Bailer Usage (Stainless Steel or Teflon-Per Each ) Per Day $ 18 . 00 <br /> Measuring Wheel Per Day $8 . 00 <br /> 35 mm Camera Per Day $8 . 00 <br /> Barricade (per unit) Per Day $3 . 00 <br /> Concrete Saw Per Day $ 100 . 00 <br /> EXPENDABLE SUPPLIES : <br /> High Capacity (0 . 45 micron ) Filter Each $22 . 00 <br /> Disposable Teflon Bailer Each $ 18 . 00 <br /> Disposable Polyethylene Bailer Each $ 13 . 00 <br /> Isopropyl Alcohol (decontamination ) Per Gallon $ 15 . 00 <br /> Deionized Water (decontamination) Per Five Gallon $ 14 .00 <br /> 16 oz . Soil Jars (soil headspace analysis) Per Box of 12 $ 10 . 00 <br /> Tygon Tubing Per Foot $2 . 50 <br /> Polyethylene Tubing Per Foot $ . 60 <br /> 55-gallon Drum Each $65 . 00 <br /> HEAVY EQUIPMENT : <br /> Vacuum Truck , Dump Truck , Crane , Excavator, <br /> Trackhoe , Backhoe , etc. Per Job Cost + 15% <br /> REMEDIATION EQUIPMENT : <br /> Cost is based on type of equipment and duration of project. Cost to be determined on project by project basis . <br /> — _ Ardaman & Associates , Inc . <br />
The URL can be used to link to this page
Your browser does not support the video tag.