My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2009-301C
CBCC
>
Official Documents
>
2000's
>
2009
>
2009-301C
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/17/2016 9:30:38 AM
Creation date
10/1/2015 3:59:19 AM
Metadata
Fields
Template:
Official Documents
Official Document Type
Agreement
Approved Date
11/17/2009
Control Number
2009-301C
Agenda Item Number
8.H.
Entity Name
Ardaman & Associates Inc.
Subject
2009/2010 renewal three months Services Agreement
Supplemental fields
SmeadsoftID
10880
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
9
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
EXHIBIT "A" <br /> ARDAMAN & ASSOCIATES , INC . <br /> FEE SCHEDULE <br /> INDIAN RIVER COUNTY <br /> GEOTECHNICAL AND ENVIRONMENTAL ENGINEERING <br /> AND CONSTRUCTION MATERIALS TESTING SERVICES <br /> f=ebruary <br /> ( November 19 , 2009 through Nerremb f8 , 2010 ) <br /> CONCRETE SAMPLING AND TESTING <br /> Cylinder samples ( up to 4 cylinders per set) : molding <br /> curing , and strength testing (ASTM C-31 and C- 39 ) . <br /> Cylinders shall be left in a place provided by the <br /> Contractor , covered with plastic caps and attempts <br /> made to provide shade thereon . If temperature of <br /> the air is critical to first 24 hours (during field curing ) , <br /> equipment to maintain such controls shall be provided <br /> by others . $80 . 00/set <br /> Additional cylinders $ 15 . 00/cylinder <br /> Technician time due to construction delays in excess <br /> of 1 . 0 hour on-site on the date cylinders are made $44 . 00/hour <br /> Technician time transporting cylinders from site to office <br /> if no other work is required $44 . 00/hour <br /> Curing and strength testing samples delivered to our <br /> laboratory (ASTM C -39 ) $ 15 . 00/cylinder <br /> Continuous monitoring of concrete placement and/or <br /> extra slump and temperature tests , technician time $44 . 00/hour <br /> Slump tests (ASTM C- 143) $ 15 . 00/test <br /> Air Entrainment (ASTM C - 173 ) $30 . 00/test <br /> Unit weight $ 35 . 00/test <br /> Yield tests $ 35 . 00/test <br /> Verification of mix design $225 . 00/each <br /> Fineness modules $44 . 00/each <br /> Plant control $44 . 00/hour <br /> Concrete blocks . Strength tests (determined by gross area ) $ 30 . 00/block <br /> Concrete blocks . Absorption and strength tests ( net area ) $ 125 . 00/set of 3 <br /> Block Prism Assembly $220 . 00/set of 3 <br /> Flexural Strength Beams ( up to 3 beams ) $ 30 . 00 each additional beam $ 150 . 00/set of 3 <br /> Test beams made by others $ 50 . 00/each <br /> Grout Prisms 3/set ( blocks supplied by others ) $ 75 . 00/set <br /> Marsh Funnel Viscosity $ 35 . 00/test <br /> SAMPLING AND TESTING OF IN -PLACE CONCRETE/SOIL CEMENT <br /> Coring and testing of cored samples : <br /> Technician time (two technicians may be required ) $44 . 00/hour <br /> Mobilization of coring equipment <br /> With power supplied $ 125 . 00/trip <br /> Without power supplied $ 100 . 00/trip <br /> Trimming , capping and strength test (ASTM C -42 ) $ 30 . 00/core <br /> Depth measurement $ 15 . 00/core <br /> Swiss Hammer <br /> Mobilization of equipment $ 50 . 00/trip <br /> Technician time $ 52 . 00/ hour <br /> '� AitJarnran t� Assu � aztE� n . inc . <br />
The URL can be used to link to this page
Your browser does not support the video tag.