My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2008-402
CBCC
>
Official Documents
>
2000's
>
2008
>
2008-402
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/20/2016 1:48:08 PM
Creation date
10/1/2015 1:10:05 AM
Metadata
Fields
Template:
Official Documents
Official Document Type
Work Order
Approved Date
12/09/2008
Control Number
2008-402
Agenda Item Number
8.E.
Entity Name
Ardaman & Associates
Subject
Work Order #2 53rd Street Bridge over Lateral H Canal
Area
53rd. St.
Project Number
0107
Supplemental fields
SmeadsoftID
8199
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
10
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
EXHIBIT "A" <br /> ARDAMAN & ASSOCIATES , INC . <br /> FEE SCHEDULE <br /> INDIAN RIVER COUNTY <br /> GEOTECHNICAL AND ENVIRONMENTAL ENGINEERING <br /> AND CONSTRUCTION MATERIALS TESTING SERVICES <br /> ( October 1 , 2008 through September 30 , 2009) <br /> GENERAL FIELD EQUIPMENT : <br /> Field Gas Chromatograph Per Day $ 300 . 00 <br /> Data Logger Per Day $240 . 00 <br /> Organic Vapor Analyzer (OVA 128 or Gastech ) Per Day $ 120. 00 <br /> Photo Ionization Detector ( Photovac Tip) Per Day $ 110. 00 <br /> Generator Per Day $95 . 00 <br /> Steam Cleaner Per Day $ 100 . 00 <br /> Surveying Equipment (Water Table Elevations) Per Day $55 . 00 <br /> Centrifugal Development Pump Per Day $ 50 . 00 <br /> Submersible Development Pump Per Day $ 100 . 00 <br /> Peristaltic Purging Pump Per Day $40 . 00 <br /> Magnetometer Per Day $35 . 00 <br /> Product/Water Interface Probe Per Day $35 . 00 <br /> pH/Conductivity Meter . Per Day $25 . 00 <br /> Turbidity Meter Per Day $55 . 00 <br /> Water Level Indicator Per Day $20 . 00 <br /> Bailer Usage ( Stainless Steel or Teflon-Per Each) Per Day $ 18 . 00 <br /> Measuring Wheel Per Day. $8 . 00 <br /> 35 mm Camera Per Day $8 . 00 <br /> Barricade (per unit) Per Day $3. 00 <br /> Concrete Saw Per Day $ 100 . 00 <br /> EXPENDABLE SUPPLIES : <br /> High Capacity (0.45 micron) Filter Each $22 . 00 <br /> Disposable Teflon Bailer Each $ 18 . 00 <br /> Disposable Polyethylene Bailer Each $ 13 . 00 <br /> Isopropyl Alcohol (decontamination) Per Gallon $ 15 . 00 <br /> Deionized Water (decontamination) Per Five Gallon $ 14 . 00 <br /> 16 oz . Soil Jars (soil headspace analysis) Per Box of 12 $ 10 . 00 <br /> Tygon Tubing Per Foot $2 . 50 <br /> Polyethylene Tubing Per Foot $ . 60 <br /> 55-gallon Drum Each $65 . 00 <br /> HEAVY EQUIPMENT : <br /> Vacuum Truck , Dump Truck, Crane , Excavator, <br /> Trackhoe, Backhoe , etc . Per Job Cost + 15 % <br /> REMEDIATION EQUIPMENT : <br /> Cost is based on type of equipment and duration of project . Cost to be determined on project by project basis . <br /> Ardaman & Associates , Inc . <br />
The URL can be used to link to this page
Your browser does not support the video tag.