My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2008-402
CBCC
>
Official Documents
>
2000's
>
2008
>
2008-402
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/20/2016 1:48:08 PM
Creation date
10/1/2015 1:10:05 AM
Metadata
Fields
Template:
Official Documents
Official Document Type
Work Order
Approved Date
12/09/2008
Control Number
2008-402
Agenda Item Number
8.E.
Entity Name
Ardaman & Associates
Subject
Work Order #2 53rd Street Bridge over Lateral H Canal
Area
53rd. St.
Project Number
0107
Supplemental fields
SmeadsoftID
8199
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
10
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
EXHIBIT " A" <br /> ARDAMAN & ASSOCIATES , INC , <br /> FEE SCHEDULE <br /> INDIAN RIVER COUNTY <br /> GEOTECHNICAL AND ENVIRONMENTAL ENGINEERING <br /> AND CONSTRUCTION MATERIALS TESTING SERVICES <br /> ( October 1 , 2008 through September 30 , 2009) <br /> MOBILIZATION AND DEMOBILIZATION <br /> • Men and Equipment $250 . 00 <br /> • Portable Barge Per Job $5 , 000 . 00 Minimum <br /> STANDARD DRILLING <br /> All Terrain Vehicle Add'I Price Per LF $ 1 . 50 <br /> Auger Borings (4-inch ) Per Lineal Foot $ 9. 00 <br /> Wash Borings - Cuttings Only (up to 3 inch ) <br /> • Soil drilling Per Lineal Foot $8 . 00 <br /> • Rock drilling Per Lineal Foot $ 12 .00 <br /> Standard Penetration Test (SPT) Borings <br /> (ASTM D- 1586) in soil (N -values <50 ) : <br /> • from surface to 25 feet Per Lineal Foot $ 12 .00 <br /> • from 25 feet to 50 feet Per Lineal Foot $ 13 . 00 <br /> • from 50 feet to 100 feet Per Lineal Foot $ 14 . 50 <br /> • from 100 feet to 125 feet Per Lineal Foot $ 18 . 00 <br /> • from 125 feet to 150 feet Per Lineal Foot $22 . 00 <br /> Standard Penetration Test (SPT) Borings in <br /> high resistance soil/rock (N -values > 50) Add 'I Price Per LF $3. 50 <br /> Furnish , Install , and Remove Casing (up to 4-inch) : <br /> • from surface to 50 feet Per Lineal Foot $ 7 . 50 <br /> • from 50 feet to 100 feet Per Lineal Foot $9. 00 <br /> • from 100 feet to 150 feet Per Lineal Foot $ 10. 50 <br /> Drilling (Time Basis)/2 man-crew Per Crew- Hour $ 145.00 <br /> Drilling (Time Basis)/3 man-crew Per Crew- Hour $ 170 . 00 <br /> Support Water Truck (Time Basis) Per Day $ 120 . 00 <br /> Rock Coring ( N or H size ) <br /> • from surface to 50 feet Per Lineal Foot $26 . 00 <br /> • from 50 feet to 100 feet Per Lineal Foot $28 . 00 <br /> • from 100 feet to 150 feet Per Lineal Foot $32 . 00 <br /> Field Permeability Per Test $350 . 00 <br /> SAMPLING <br /> Additional SPT Sampling : <br /> • from 10 feet to 25 feet Per Additional Sample $23 . 00 <br /> • from 26 feet to 50 feet Per Additional Sample $26 . 00 <br /> • from 51 feet to 100 feet Per Additional Sample $29 .00 <br /> • from 101 feet to 125 feet Per Additional Sample $34 .00 <br /> • from 126 feet to 150 feet Per Additional Sample $39 . 00 <br /> Undisturbed Samples : <br /> • Shelby Tube Per Sample $ 100 . 00 <br /> • Fixed -Piston Shelby, Osterberg , Pitcher Per Sample $ 110 . 00 <br /> SOUNDINGS <br /> Electric Dutch Cone Soundings Per Lineal Foot $ 9 . 50 <br /> Piezocone Soundings Per Lineal Foot $ 10 . 50 <br /> Muck Probing/Clay Sampling Per Crew Hour $ 120 . 00 <br /> Cone/Piezoprobe Soundings ( Time Basis ) Per Crew Hour $ 170 . 00 <br /> Piezoprobe Dissipation Monitoring Per Crew Hour $ 130 . 00 <br /> OTHER CHARGES <br /> Clearing Difficult Access , Hole Location and Set- Up Per Crew- Hour $ 125 . 00 <br /> Standby Time Per Crew- Hour $ 125 .00 <br /> Piezometer and Well Installation ( plus materials ) Per Crew- Hour $ 140 . 00 <br /> Bore Hole Grouting and Sealing ( plus materials ) Per Crew-Hour $ 140 . 00 <br /> Welt Clearing/Sensitivity/Water Level Per Crew- Hour $ 125 .00 <br /> Air Boat Use Per Day $ 300 . 00 <br /> Instrumentation Unit Use Per Day $ 150 . 00 <br /> Materials Per Job At Cost + 12 % <br /> e Ab` wuen & Associates , Inc . Normal drilling rates times 1 . 5 <br /> Borings Normal drilling rates times 1 . 5 <br />
The URL can be used to link to this page
Your browser does not support the video tag.