My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2008-403
CBCC
>
Official Documents
>
2000's
>
2008
>
2008-403
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/20/2016 1:50:27 PM
Creation date
10/1/2015 1:10:12 AM
Metadata
Fields
Template:
Official Documents
Official Document Type
Work Order
Approved Date
12/09/2008
Control Number
2008-403
Agenda Item Number
8.F.
Entity Name
Ardaman & Associates
Subject
Work Order #3 56th Place Bridge
Area
56th Place Bridge Over North Relief Canal
Project Number
0611
Supplemental fields
SmeadsoftID
8200
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
10
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
EXHIBIT " A" <br /> ARDAMAN & ASSOCIATES , INC . <br /> FEE SCHEDULE <br /> INDIAN RIVER COUNTY <br /> GEOTECHNICAL AND ENVIRONMENTAL ENGINEERING <br /> AND CONSTRUCTION MATERIALS TESTING SERVICES <br /> ( October 1 , 2008 through September 30 , 2009) <br /> GENERAL FIELD EQUIPMENT : <br /> Field Gas Chromatograph Per Day $ 300 . 00 <br /> Data Logger 99 Per Day $240 . 00 <br /> Organic Vapor Analyzer (OVA 128 or Gastech ) Per Day $ 120. 00 <br /> Photo Ionization Detector (Photovac Tip) Per Day $ 110. 00 <br /> Generator Per Day $95 . 00 <br /> Steam Cleaner Per Day $ 100. 00 <br /> Surveying Equipment (Water Table Elevations) Per Day $55 . 00 <br /> Centrifugal Development Pump Per Day $ 50 . 00 <br /> Submersible Development Pump Per Day $ 100.00 <br /> Peristaltic Purging Pump Per Day $40. 00 <br /> Magnetometer Per Day $35 . 00 <br /> Product[Water Interface Probe Per Day $ 35 . 00 <br /> pH/Conductivity Meter . Per Day $25 . 00 <br /> Turbidity Meter Per Day $55 . 00 <br /> Water Level Indicator Per Day $20 . 00 <br /> Bailer Usage (Stainless Steel or Teflon-Per Each) Per Day $ 18 . 00 <br /> Measuring Wheel Per Day. $8 .00 <br /> 35 mm Camera Per Day $8. 00 <br /> Barricade (per unit) Per Day $3. 00 <br /> Concrete Saw Per Day $ 100 . 00 <br /> EXPENDABLE SUPPLIES : <br /> High Capacity (0.45 micron) Filter Each $22 . 00 <br /> Disposable Teflon Bailer Each $ 18 . 00 <br /> Disposable Polyethylene Bailer Each $ 13 . 00 <br /> Isopropyl Alcohol (decontamination) Per Gallon $ 15 . 00 <br /> Deionized Water (decontamination) Per Five Gallon $ 14 . 00 <br /> 16 oz . Soil Jars (soil headspace analysis) Per Box of 12 $ 10 . 00 <br /> Tygon Tubing Per Foot $2 .50 <br /> Polyethylene Tubing Per Foot $ . 60 <br /> 55-gallon Drum Each $65 . 00 <br /> HEAVY EQUIPMENT : <br /> Vacuum Truck , Dump Truck, Crane , Excavator, <br /> Trackhoe , Backhoe , etc . Per Job Cost + 15 % <br /> REMEDIATION EQUIPMENT: <br /> Cost is based on type of equipment and duration of project . Cost to be determined on project by project basis . <br /> 11W V Ardaman & Associates , Inc . <br />
The URL can be used to link to this page
Your browser does not support the video tag.