My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2008-406
CBCC
>
Official Documents
>
2000's
>
2008
>
2008-406
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/20/2016 2:08:19 PM
Creation date
10/1/2015 1:10:27 AM
Metadata
Fields
Template:
Official Documents
Official Document Type
Work Order
Approved Date
12/09/2008
Control Number
2008-406
Agenda Item Number
8.1
Entity Name
Ardaman Associates
Subject
Work Order No.4 Services CR 510
Area
61st. Drive to Shore Lane
Project Number
0534
Supplemental fields
SmeadsoftID
8203
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
5
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
WO# 4 <br /> M510 From 61St Drive to Shore Lane <br /> will be provided by the client or their design consultant . Geometry will need to extend <br /> a minimum of 40 feet out from the existing toe of slope . We note that for the seepage <br /> portion of the stability analyses , relative permeability will be assigned to each of the <br /> encountered soil strata . This assumes that the actual quantity of seepage through the <br /> slope is not required for the project . If estimates of seepage quantity are required , this <br /> proposal will need to be revised to incorporate field and/or laboratory permeability <br /> testing <br /> All work shall also comply with the current Florida Minimum Technical Standards . <br /> COMPENSATION . <br /> The COUNTY agrees to pay, and the Geotechnical Professional agrees to accept , a fee for <br /> services rendered according to the above " Scope of Services " and identified in the attached <br /> EXHIBIT "A" Fee Schedule . <br /> A Not-to- Exceed Amount of: $ 16 , 946 . 00 to be paid on a unit price basis for actual work <br /> performed in accordance with the schedule of services and fees set forth in Exhibit A of <br /> RENEWAL OF THE ANNUAL GEOTECHNICAL SERVICES CONTRACT IRC RFQ NO . <br /> 2008071 WITH ARDAMAN & ASSOCIATES INC . Effective Date : November 18 , 2008 . <br /> TIME FOR COMPLETION <br /> Following receipt of the written authorization to proceed , the estimated schedule for the <br /> geotechnical work will be as follows : <br /> • Project start- up , boring layout and utility clearance and Field Exploration — 2 to 3 Weeks <br /> • Laboratory testing — 2 weeks <br /> • Engineering analysis , preparation and submittal of draft report — 1 to 2 weeks <br /> • Finalize report - 1 week <br /> SCHEDULE TOTAL : 6 to 8 weeks <br /> I )( k LlnlentS and Settings dan . nallack ' I oca1 Set tings ' " IemporaI % Internet I iIcs'�0I _ KA ' C' R - > 10 \\ 0-14 At (I I I <br />-? U -OR -doe <br />
The URL can be used to link to this page
Your browser does not support the video tag.