EXHIBIT 1 <br /> Department. During the demolition process, any debris left on site with Department <br /> permission shall be placed on the rear of the property or as far away from pedestrian traffic <br /> as possible. Asbestos containing material (ACM) stored overnight must be kept in <br /> locked dumpsters or Contractor-owned/leased closed bed and securable vehicles. <br /> Contractor is to ensure that sites are leveled and backfilled to adjacent ground level. Any <br /> fill required must be furnished by the Contractor and must be clean, compactable fill. All <br /> disturbed areas must be graded and raked free of debris. <br /> n. The Contractor shall cap all on-site water systems in accordance with current rules and <br /> regulations. A representative of the Department must be present for inspection when this <br /> work and all other items listed in this section are performed . There can be no exceptions. <br /> An appointment may be made by contacting Elaine Green, (407) 532-3999 ext. 3623. <br /> WELLS: All wells must be abandoned by the Contractor in accordance with Florida Department of <br /> Environmental Protection Rule 17-532 .500(4), F. A . C. Documentation of such abandonment within <br /> the allotted time period must be presented to the Department before payment will be made. <br /> SEPTIC TANKS & LIFT STATIONS: Septic tanks and lift stations to be pumped out and removed. <br /> Pump outs are determined by the necessity and condition per tank. Removal by the Contractor shall be <br /> done in accordance with any applicable state and local laws and regulations. Existing sewer system, <br /> manholes, etc. are to be left intact and undamaged. <br /> SWIMMING POOLS : In-ground pools must be excavated, materials totally removed, and the pool <br /> area filled, firmly compacted and graded to adjacent ground level . <br /> IV. ASBESTOS DEMOLITION SURVEY AND ABATEMENT <br /> SPECIFICATIONS/SUPERVISION <br /> Introduction <br /> The purpose of the asbestos survey and related activities is to identify and address any Asbestos <br /> Containing Materials (ACM) in the buildings located within the project ' s boundaries for the <br /> Statewide Contract. Prior to demolition, these facilities must be surveyed and the presence or <br /> absence of ACM documented. A management plan and abatement specifications must also be <br /> developed if ACM is determined to be present. Abatement specifications are to be of sufficient <br /> detail so as to be used as a scope of services for an asbestos abatement contract. Contract <br /> administration, abatement supervision and building clearance activities shall also be provided. <br /> Standards <br /> Asbestos Consulting activities are to be conducted under the direction of an Asbestos Consultant <br /> licensed pursuant to F .S . 469.003 -469.006 and shall be conducted in accordance with F .S. 255 .551 - <br /> 255 . 565 and other applicable local, state and federal laws and guidelines pertaining to asbestos in <br /> vacant state owned buildings proposed for demolition. <br /> Asbestos surveys shall be performed, using as a guide, the State of Florida Building Asbestos <br /> Survey Specifications, which by this reference is made a part hereof and/or other guidance <br /> procedures established by the Florida Department of Labor and Employment Security (FDLES) for <br /> State owned vacant buildings proposed for demolition. Asbestos abatement shall be in accordance <br /> with the National Emissions Standards for Hazardous Air Pollutants (NESHAPS) 40 CFR Part 61 <br /> Subpart M. Occupational Safety and Health Administration (OSHA) standards, and <br /> recommendations made by the FDLES and Florida Department of Environmental Protection <br /> (FDEP) or its designated authority. <br /> Scope of Services PageA 4 of 10 <br /> Abatement, Demolition and Removal 39 of 55 <br />