My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2007-302
CBCC
>
Official Documents
>
2000's
>
2007
>
2007-302
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/22/2016 2:14:19 PM
Creation date
9/30/2015 11:08:18 PM
Metadata
Fields
Template:
Official Documents
Official Document Type
Agreement
Approved Date
09/11/2007
Control Number
2007-302
Agenda Item Number
11.C.1
Entity Name
Cross Environmental Services Inc.
Subject
Asbestos Abatement Agreement Demolition and Removal
Area
Old County Administration Bldg.
Supplemental fields
SmeadsoftID
6552
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
47
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
EXHIBIT 2 <br /> ITEM # DESCRIPTION QUANTITY UNIT $ TOTAL <br /> a � <br /> . : . 0 <br /> 4 . 11 . 1 Well - Remove 2-inch Diameter lineal feet $6. 00 $ <br /> 4. 11 .2 Well - Remove 4-inch Diameter lineal feet $7. 00 $ <br /> 4. 11 .3 Well - Remove 6-inch Diameter lineal feet $9 .00 $ <br /> 4. 11 .4 Well - Remove 8-inch Diameter lineal feet $12.00 $ <br /> 4 . 12 . 1 Above-ground Systems'perfoot $1 .00 $ <br /> 4 . 12 .2 In-ground Systems per foot $1 .00 $ <br /> 4 . 1 2 .3 Hydraulic Lifts price per lift $ 10 .00 $ <br /> 4 . 12 .4 Debris Removal price per ton $40 .00 $ <br /> 4 . 12 .5 Fill Material price per cubic yard $10 .00 $ <br /> 4 . 13. 1 Hydraulic Lift-Remove & Demolish Price per Lift 3 $250. 00 $750 .00 <br /> 4 . 14 . 1 Laborer per Man-hour $40.00 $ <br /> 4 . 14 .2 Electrician per Man-hour <br /> 4 . 14 .3 Plumber per Man-hour <br /> 4 . 14.4 Permit Expediter per Man-hour $65.00 $ <br /> 4 . 14 .5 Tire Removal Man-hour rate $45.00 $ <br /> 4. 14 .5 Wet Demolition Additional Price per square foot 815158 $ 1 .00 $81 ,158.00 <br /> 4 . 14 .6 Wet Demolition Man-hour rate $45 .00 $ <br /> 4 . 14 .7 Steel Tank (non-hazardous) Man-hour rate $45 .00 $ <br /> 4. 14 . 8 Traffic Maintenance MOT $40.00 $ <br /> 4 . 15. 1 Window Installation w/1 /2" 3-ply CDX plywood sq . ft. $8. 00 $ <br /> 4 . 15.2 Masonry Installation w/1 /2" 3-ply CDX plywood sq . ft. $8. 00 $ <br /> 4. 15.3 Wood Installation w/1 /2" 3-ply CDX plywood sq . ft. $8 .00 $ <br /> 4 . 15 .4 lGarage Door Installation w/1 /2" 3-ply CDX plywood sf $8.00 $ <br /> 4. 15 .5 Imiscelianeous Openings Installation $8 .00 $ <br />
The URL can be used to link to this page
Your browser does not support the video tag.