My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2003-109
CBCC
>
Official Documents
>
2000's
>
2003
>
2003-109
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/13/2016 4:21:22 PM
Creation date
9/30/2015 6:30:20 PM
Metadata
Fields
Template:
Official Documents
Official Document Type
Agreement
Approved Date
05/06/2003
Control Number
2003-109
Agenda Item Number
11.H.1.
Entity Name
Atlantic Coast Construction & Development, Inc.
Subject
providing water and wastewater facilities
Area
Tropical Isle/Park Lake Estates - 8730 US Hwy 1
Archived Roll/Disk#
3161
Supplemental fields
SmeadsoftID
3234
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
12
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
PAGE 02 <br /> a <br /> t <br /> 3 <br /> JOSEPH w. scNULle PE. SCH ULKE , BITTLE & STODDARD , L . L . C . <br /> XK" B. BRTLI; P.E. <br /> %MUJAM P SIMMao, an . D_ , PE. CML & STRUCTURAL ENGINEERING LAND PLANIWNG • ENVIRONMENTAL pERMrMNG <br /> Steve Doyle, P .E . December 18, 2002 <br /> Utilities Department <br /> Indian River County <br /> 1840 25th Street <br /> Vero Beach, F) 32960 <br /> RE : Park Lane Estates / Tropical Isle <br /> Developers Agreement <br /> Dear Mr. Doyle, <br /> In accordance with our meeting last week, we have prepared the following conditions we <br /> feel need to be a part of the agreement: <br /> Pierre Paquette / Park Lane Estates, Inc. will execute the Agreement, not as one of the <br /> two parties in the agreement, but as a third party acknowledging certain requirements, listed as <br /> follows : <br /> 1 • Plans prepared by the developer of the facilities that lie within Paquette,s <br /> property must be approved by Paquette. <br /> 2 • The developer shall provide evidence of Insurance as outlined in section <br /> 13 ., and shall name Paquette / Park Lane Estates, Inc. as an additional <br /> insured. <br /> 3 . The developer shall provide Insurance and Indemnification to Paquette / <br /> Park Lane Estates, Inc. as it does the county, as outlined in section 13 . <br /> 4 . The lift station shall be designed to accommodate the additional sewer <br /> generated from the Paquette site (44 lots, 11000 gpd) <br /> Additional areas that need to be addressed within the context of the agreement: <br /> 1 • As we understand it, IRC will be requiring the future reimbursement of the <br /> County's cost share of the facilities from Paquette. The agreement seems to <br /> imply that �V2 of the costs will be paid by Atlantic Coast, and '/: by IRC . <br /> However is not actually stated that it is a 50% /50% deal. If the actual costs <br /> are more than the estimate, IRC (and eventually Paquette) will be obligated to <br /> Pay more than one half of the cost. The language should be edited so it is clear <br /> that the costs are shared 50% / 50•/0 . <br /> If you have any questions please do not hesitate to give me a call. <br /> J W. chulke, P. <br /> Cc : Pierre Paquette <br /> 1140 7" COURT. SWE F VERO BEACH , FLORIDA 32960 <br /> TEL 772 / 770.9622 FAx 772 / 770 -9496 EmAx sbseng@gate. net <br />
The URL can be used to link to this page
Your browser does not support the video tag.