My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2005-382
CBCC
>
Official Documents
>
2000's
>
2005
>
2005-382
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/15/2016 2:05:43 PM
Creation date
9/30/2015 9:27:04 PM
Metadata
Fields
Template:
Official Documents
Official Document Type
Agreement
Approved Date
11/15/2005
Control Number
2005-382
Agenda Item Number
14.A.2
Entity Name
Barth Construction
Subject
Fire Station #10 - Renovation
Area
Fire Station #10
Supplemental fields
SmeadsoftID
5289
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
27
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Attachment " C " <br /> IlkRTH <br /> Construction, Inc. <br /> General Contractor . CGCO07847 <br /> MEETING MINUTES <br /> DATE/TIME : May 1 1 , 2005 1 : 30 PM <br /> LOCATION : Station # 10 Fellsmere <br /> IN ATTENDANCE : <br /> Jason Fykes John Binkley <br /> Ed Prime <br /> 1 . All three of us walked the project and developed the scope of work for the repairs to this <br /> station . The General Program for the renovation/addition of this station is below: <br /> • Remove/Replace damaged dry acoustical ceiling grid/tile insulation in dormitory. <br /> • Reuse existing speakers, lights and fans . <br /> • Replace and repair water-damaged drywall on the walls in 3 locations . ( 1 in <br /> dormitory and 2 in garage bay. <br /> • Investigate crack in existing roof T on East of garage bay. <br /> 2 . A pad mount diesel generator will be installed at this station . Since the lead times for <br /> generators are over 25 weeks, this will be under a separate project. <br /> If you feel these minutes are inaccurate or incomplete, please notes us, in writing, as soon as <br /> possible. Thank you. <br /> * * * * * * * The following items were added to the scope of work for Station #10 at the monthly <br /> progress meeting held 5.25.05 * * * * * * * <br /> • Install electrical hardware to allow for future pad mounted generator <br /> * * * * * * * The above scope of work was revised at the September monthly meeting* * * * * * * <br /> An alternate price is to be provided by Barth Construction to replace the existing flat roof <br /> in lieu of the truss roof system in the original scope. <br /> 1717 Indian River Boulevard * Suite 202A * Vero Beach, Florida 32960 <br /> Phone: (772) 778-3072 * Fax: (772) 770-3017 <br /> E-mail : infopd!! bai-thconstruction .com * Internet: w_ww_.barthconstruction .coni <br /> _ . <br /> \\Ntsbs\barth\Projects\IRC Fire Stations\STATION # 10\Meetings\Station # 10 scope meeting 5 . 11 . 05 . doc <br />
The URL can be used to link to this page
Your browser does not support the video tag.