Laserfiche WebLink
SCHEDULE OF CONTRACT VALUES <br /> FOR <br /> FELLSMERE CONVENIENCE CENTER <br /> The Items below shall include costs for furnishing to the OWNER all materials, equipment, and supplies <br /> and for all costs incurred in completing the work identified in the Contract Documents including <br /> installation of all materials, equipment, and supplies furnished, complete in place and ready for service, <br /> all labor, permit fees, taxes, insurance, miscellaneous costs, overhead and profit. <br /> Item No. Bid Item Description Total Item Price <br /> 1 Com I in with Contract Conditions (Including Permit Conditions $ 1082845 . 15 <br /> 2 On-Site Demolition Clearing and Grubbing (Including Well $ 18,311 . 18 <br /> 3 On-Site Earthwork Excavation and Gradin $ 36,089.95 <br /> 4 On-Site Clean Imported Fill and Compaction $ 141 , 152 .70 <br /> 5 On-Site Stormwater Conveyance and Treatment System $ 69,857 .66 <br /> 6 New Water: Main; Hydrant; Services & Hydrant Relocations $ 16,818 .76 <br /> 7 New Wastewater Collection Services Treatment & Disposal System $ 12,846.40 <br /> 8 MSE Structural: Foundation Wall and Wall Ca $ 4039120.01 <br /> 9 On-Site Sub rade for Asphalt, Concrete & RAP Surface Courses $ 339870.58 <br /> 10 On-Site 8-inch Base Rock for Asphalt Surfaces $ 40,009.39 <br /> 11 On-Site 2-inch Asphalt Surface Course $ 419061 .49 <br /> 12 On-Site 12-inch Structural Concrete Surface Course $ 190,520.90 <br /> 13 On-Site 6-inch Concrete Paving Surface Course $ 689799.22 <br /> 14 On-Site 4-inch RAP Shell or Crushed Rock Surface Course $ 11 ,530.75 <br /> 15 On-Site Striving, Signage and Bollards w/ Covers S 37,502.98 <br /> 16 Pre-Engineered Structures Tie-Downs and Utility Connections $ 76,782.04 <br /> 17 Coordination w/ F. P. & L. and A. .T.& T. to obtain new Utility Service S 529.22 <br /> 18 Electrical and Site Lighting S 309590. 13 <br /> 19 Landscaping <br /> $ 613299.04 <br /> 20 Sodding S 19,004.46 <br /> 21 Irrigation and Lake Recharge System $ 342590. 13 <br /> 22 <br /> Fencing and Gates $ 40,389.37 <br /> 23 Site Equipment Miscellaneous Hardware $ 12,594.49 <br /> 24 Traffic Control During Construction $ 182493 .23 <br /> 25 Erosion Control During Construction and Compliance with SWPPP $ 20,004.69 <br /> (Continued On Next Page) <br /> FELLSMERE CONVENIENCE CENTER 00530 — Standard Form of Agreement <br /> 00530 - 7 <br />