My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2008-130
CBCC
>
Official Documents
>
2000's
>
2008
>
2008-130
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/30/2016 11:29:23 AM
Creation date
10/1/2015 12:07:42 AM
Metadata
Fields
Template:
Official Documents
Official Document Type
Agreement
Approved Date
04/22/2008
Control Number
2008-130
Agenda Item Number
15.B.2
Entity Name
Barth Construction
SWDD District
Subject
Fellsmere Customer Convenience Center Agreement on Stipulated Price
Bid Number
2008017
Supplemental fields
SmeadsoftID
6996
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
20
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
SCHEDULE OF CONTRACT VALUES <br /> FOR <br /> FELLSMERE CONVENIENCE CENTER <br /> The Items below shall include costs for furnishing to the OWNER all materials, equipment, and supplies <br /> and for all costs incurred in completing the work identified in the Contract Documents including <br /> installation of all materials, equipment, and supplies furnished, complete in place and ready for service, <br /> all labor, permit fees, taxes, insurance, miscellaneous costs, overhead and profit. <br /> Item No. Bid Item Description Total Item Price <br /> 1 Com I in with Contract Conditions (Including Permit Conditions $ 1082845 . 15 <br /> 2 On-Site Demolition Clearing and Grubbing (Including Well $ 18,311 . 18 <br /> 3 On-Site Earthwork Excavation and Gradin $ 36,089.95 <br /> 4 On-Site Clean Imported Fill and Compaction $ 141 , 152 .70 <br /> 5 On-Site Stormwater Conveyance and Treatment System $ 69,857 .66 <br /> 6 New Water: Main; Hydrant; Services & Hydrant Relocations $ 16,818 .76 <br /> 7 New Wastewater Collection Services Treatment & Disposal System $ 12,846.40 <br /> 8 MSE Structural: Foundation Wall and Wall Ca $ 4039120.01 <br /> 9 On-Site Sub rade for Asphalt, Concrete & RAP Surface Courses $ 339870.58 <br /> 10 On-Site 8-inch Base Rock for Asphalt Surfaces $ 40,009.39 <br /> 11 On-Site 2-inch Asphalt Surface Course $ 419061 .49 <br /> 12 On-Site 12-inch Structural Concrete Surface Course $ 190,520.90 <br /> 13 On-Site 6-inch Concrete Paving Surface Course $ 689799.22 <br /> 14 On-Site 4-inch RAP Shell or Crushed Rock Surface Course $ 11 ,530.75 <br /> 15 On-Site Striving, Signage and Bollards w/ Covers S 37,502.98 <br /> 16 Pre-Engineered Structures Tie-Downs and Utility Connections $ 76,782.04 <br /> 17 Coordination w/ F. P. & L. and A. .T.& T. to obtain new Utility Service S 529.22 <br /> 18 Electrical and Site Lighting S 309590. 13 <br /> 19 Landscaping <br /> $ 613299.04 <br /> 20 Sodding S 19,004.46 <br /> 21 Irrigation and Lake Recharge System $ 342590. 13 <br /> 22 <br /> Fencing and Gates $ 40,389.37 <br /> 23 Site Equipment Miscellaneous Hardware $ 12,594.49 <br /> 24 Traffic Control During Construction $ 182493 .23 <br /> 25 Erosion Control During Construction and Compliance with SWPPP $ 20,004.69 <br /> (Continued On Next Page) <br /> FELLSMERE CONVENIENCE CENTER 00530 — Standard Form of Agreement <br /> 00530 - 7 <br />
The URL can be used to link to this page
Your browser does not support the video tag.