My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2005-381
CBCC
>
Official Documents
>
2000's
>
2005
>
2005-381
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/15/2016 1:59:58 PM
Creation date
9/30/2015 9:26:54 PM
Metadata
Fields
Template:
Official Documents
Official Document Type
Agreement
Approved Date
11/15/2005
Control Number
2005-381
Agenda Item Number
14.A.2
Entity Name
Barth Construction
Subject
Fire Station #8 -/Emergency Services
Area
1115 Barber St. Sebastian Fire Station #8
Supplemental fields
SmeadsoftID
5288
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
26
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
. 1 costs of labor , including social security , old age and unemployment <br /> insurance , fringe benefits required by agreement or custom , and workers ' <br /> compensation insurance ; <br /> . 2 costs of materials , supplies and equipment, including cost of transportation , <br /> whether incorporated or consumed ; <br /> . 3 rental costs of machinery and equipment exclusive of hand tools , whether <br /> rented from the Design/Builder or others ; <br /> .4 costs of premiums for all bonds and insurance permit fees , and sales , use or <br /> similar taxes ; <br /> . 5 additional costs of supervision and field office personnel directly attributable <br /> to the change ; and fees paid to the Architect, engineers and other <br /> professionals . <br /> § 8 . 3 . 3 Pending final determination of cost to the Owner, amounts not in dispute may be <br /> included in Applications for Payment . The amount of credit to be allowed by the <br /> Design/Builder to the Owner for deletion or change which results in a net decrease in <br /> the Contract Sum will be actual net cost . When both additions and credits covering <br /> related Work or substitutions are involved in a change , the allowance for overhead and <br /> profit shall be figured on the basis of the net increase , if any , with respect to that <br /> change . <br /> § 8 . 3 .4 When the Owner and the Design/Builder agree upon the adjustments in the <br /> Contract Sum and Contract Time , such agreement shall be effective immediately and <br /> shall be recorded by preparation and execution of an appropriate Change Order. <br /> § 8 .4 MINOR CHANGES IN THE WORK <br /> § 8 .4. 1 The Design/Builder shall have authority to make minor changes in the <br /> Construction Documents and construction consistent with the intent of the Contract <br /> Documents when such minor changes do not involve adjustment in the Contract Sum or <br /> extension of the Contract Time . The Design/Builder shall promptly inform the Owner, in <br /> writing , of minor changes in the Construction Documents and construction . <br /> § 8 . 5 CONCEALED CONDITIONS <br /> § 8 . 5 . 1 If conditions are encountered at the site which are ( 1 ) subsurface or otherwise <br /> concealed physical conditions which differ materially from those indicated in the <br /> Contract Documents , or (2 ) unknown physical conditions of an unusual nature which <br /> differ materially from those ordinarily found to exist and generally recognized as <br /> inherent in construction activities of the character provided for in the Contract <br /> Documents , then notice by the observing party shall be given to the other party promptly <br /> before conditions are disturbed and in no event later than 21 days after first observance <br /> of the conditions . The Contract Sum shall be equitably adjusted for such concealed or <br /> unknown conditions by Change Order upon claim by either party made within 21 days <br /> after the claimant becomes aware of the conditions . <br /> 16 <br />
The URL can be used to link to this page
Your browser does not support the video tag.