My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2007-386
CBCC
>
Official Documents
>
2000's
>
2007
>
2007-386
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/28/2016 11:09:50 AM
Creation date
9/30/2015 11:26:47 PM
Metadata
Fields
Template:
Official Documents
Official Document Type
Certificate
Approved Date
11/06/2007
Control Number
2007-386
Agenda Item Number
14.A.2
Entity Name
Barth Construction
Subject
Certificate of Substantial Completion
Punch List
Area
Fire Station #4 1500 9th St. SW
Project Number
070105VB/
Supplemental fields
SmeadsoftID
6682
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
42
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CHANGE ORDER Distribution to : <br /> AIA DOCUMENT G701 OWNER <br /> ARCHITECT <br /> CONTRACTOR <br /> FIELD <br /> OTHER — Donadio <br /> PROJECT : CHANGE ORDER NUMBER: 1 <br /> I . R.C . Fire Station 44 <br /> 1500 Oslo Road <br /> Vero Beach, FL 32960 <br /> INITIATION DATE : 10/01 /07 <br /> TO (Contractor): <br /> I— —i ARCHITECT' S PROJECT NO : <br /> Barth Construction, Inc. <br /> 1717 Indian River Blvd. CONTRACT FOR: <br /> Suite 202A <br /> L Vero Beach, FL 32960 -1 CONTRACT DATE : <br /> You are directed to make the following changes in this Contract: <br /> This Change Order will adjust the Contract to match the final cost of the Project. <br /> Final Cost of Construction (Including Contractor' s Fee) $2, 130,096.03 <br /> Less Current Contract Amount <$2, 182.645 .00> <br /> Change Order Amount <$ 525548 .97> <br /> Not valid until signed by both the Architect and Owner. <br /> Signature of the Contractor indicates his agreement herewith, including any adjustment in the Contract Sum or Contract Time <br /> The Original (Contract Sum) (r_. ..._....teed- lirla iFfl m Cost) was . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . $2, 182,645 . 00 <br /> Net change by previously authorized Change Orders . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . -$ 0 <br /> The (Contract Sum) (GRaFanteed " "..lA.. ufn Cost) prior to this Change Order was . . . . . . . . . . . . $2, 182,645 . 00 <br /> The (Contract Sum ) (r-. . .._.. nteea Ma*i.. ufn Cost` will be d) (decreased"• • -nom . hanged) <br /> by this Change Order . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . <br />. . . -$ 52,548 .97 <br /> The new (Contract Sum) (Guaranteed Maximum Cost including this Change Order will be $2, 130,096. 03 <br /> The Contract Time will be (increased) (decreased) (unchanged) by ( ) Days <br /> The Date of Substantial Completion as of the date of this Change Order therefore is <br /> ARCHITECT CONTRACTOR OWNER <br /> Edlund, Dritenbas, Binklev, Arch . Barth Construction Indian River County Dept. of Emer. <br /> 65 Royal Palm Pointe, Suite D 1717 Indian River Blvd. 1840 25`h Street <br /> Vero Be L 3;960 Suite 202A Vero Beach, FL 32960 <br /> Vero Beach, FL 32960 <br /> BY: PAUL 41- .4 17SuBf/S BY: - c— BYc <br /> DATE : aocT2�� DAT �O ' I ' o� DATE: <br /> AIA DOCUMENT G701 * CHANGE ORDER * APRIL 1978 EDITION * AIA * 1978 <br /> THE AMERICAN INSTITUTE OF ARCHITECTS, 1735 NEW YORK AVE. , N .W., WASHINGTON, D.C . 20006 <br />
The URL can be used to link to this page
Your browser does not support the video tag.