Laserfiche WebLink
`J <br /> ® <br /> = :=AIA Document G704TM - 2000 <br /> Certificate of Substantial Completion <br /> PROJECT: PROJECT NUMBER: 070105VB/ OWNER: <br /> (Name and address): CONTRACT FOR: General Construction ARCHITECT: ❑ <br /> IRCFD Station #4 CONTRACT DATE: 06/01/06 <br /> 1500 9" Street SW CONTRACTOR: <br /> Vero Beach, FL 32962 <br /> FIELD: ❑ <br /> TO OWNER: TO CONTRACTOR: <br /> (Name and address): (Name and address): OTHER: ❑ <br /> Indian River County Barth Construction <br /> 1840 25" Street 1717 Indian River Blvd., Ste 202-A <br /> Vero Beach, FL 32960 Vero Beach, FL 32960 <br /> PROJECT OR PORTION OF THE PROJECT DESIGNATED FOR PARTIAL OCCUPANCY OR USE SHALL INCLUDE: <br /> The Work performed under this Contract has been reviewed and found, to the Architect' s best knowledge, information and belief, <br /> to be substantially complete. Substantial Completion is the stage in the progress of the Work when the Work or designated portion <br /> is sufficiently complete in accordance with the Contract Documents so that the Owner can occupy or utilize the Work for its <br /> intended use. The date of Substantial Completion of the Project or portion designated above is the date of issuance established by <br /> this Certificate, which is also the date of commencement of applicable warranties required by the Contract Documents, except as <br /> stated below: <br /> Warranty Date of Commencement <br /> Edlund, Dritenbas, Hinkley June 28, 2007 <br /> Architects & Assoc., P.A. <br /> ARCHITECT BY DATE OF ISSUANCE <br /> A list of items to be completed or corrected is attached hereto. The failure to include any items on such list does not alter the <br /> responsibility of the Contractor to complete all Work in accordance with the Contract Documents. Unless otherwise agreed to in <br /> writing, the date of commencement of warranties for items on the attached list will be the date of issuance of the final Certificate of <br /> Payment or the date of final payment. �r <br /> Cost estimate of Work that is incomplete or defective: $ 0.00 / Odol! 4 /f/ T a.W11 Z� . P D <br /> The Contractor will complete or correct the Work on the list of items attached hereto within Zero ( 0 ) days from the above date of <br /> Substantial Completion. / —7 <br /> ,84tzttF ConS�LtuL?IsN GIZY�/ O <br /> CONTRACTOR p E _t <br /> The Owner accepts the Work or designated portion as substantially to andwill assume full possession at (time) on <br /> (date). <br /> Indian River County r 11 / 06 /07 <br /> OWNER DATE <br /> The responsibilities of the Owner and Contra or for security, <br /> p y; fiaintenanei heat, utilities, damage to the Work and insurance shall <br /> be as follows: <br /> (Note: Owner 's and Contractor's legal and insurance counsel should determine and review insurance requirements and coverage.) <br /> AIA Document G704TM — 2000. Copyright © 1963, 1978, 1992 and 2000 by The American Institute of Architects. All rights reserved. WARNING: This Al e <br /> Document is protected by U.S. Copyright Law and International Treaties. Unauthorized reproduction or distribution of this AIA° Document, or any 1 <br /> portion of it, may result in severe civil and criminal penalties, and will be prosecuted to the maximum extent possible under the law. This document was <br /> produced by AIA software at 08:23:02 on 06/28/2007 under Order No.1000299470_1 which expires on 4/29/2008, and is not for resale. <br /> User Notes: (788564186) <br />