My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2007-386
CBCC
>
Official Documents
>
2000's
>
2007
>
2007-386
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/28/2016 11:09:50 AM
Creation date
9/30/2015 11:26:47 PM
Metadata
Fields
Template:
Official Documents
Official Document Type
Certificate
Approved Date
11/06/2007
Control Number
2007-386
Agenda Item Number
14.A.2
Entity Name
Barth Construction
Subject
Certificate of Substantial Completion
Punch List
Area
Fire Station #4 1500 9th St. SW
Project Number
070105VB/
Supplemental fields
SmeadsoftID
6682
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
42
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
C=AI Document G703TN - 1992 Instructions <br /> Continuation Sheet <br /> GENERAL INFORMATION <br /> Purpose and Related Documents. AIA Document G702, Application and Certificate for Payment, is to be used in conjunction with AIA Document G703, <br /> Continuation Sheet. These documents are designed for use on Projects where the Contractor has a direct Agreement with the Owner. Procedures for their use are <br /> covered in AIA Document A201 , General Conditions of the Contract for Construction. <br /> Use of Current Documents. Prior to using any AIA Contract Document, users should consult www.ala.org or a local AIA component to verify the most recent <br /> edition . <br /> Reproductions. This document is a copyrighted work and may not be reproduced or excerpted from without the express written permission of the AIA. There is <br /> no implied permission to reproduce this document, nor does membership in The American Institute of Architects confer any further rights to reproduce this <br /> document. The AIA hereby grants the purchaser a limited license to reproduce a maximum of ten copies of a completed G703 , but only for use in connection with <br /> a particular project. The AIA will not permit reproduction outside of the limited license for reproduction granted above, except upon written request and receipt of <br /> written permission from the AIA. Rights to reproduce the document may vary for users of AIA software. Licensed AIA software users should consult the End User <br /> License Agreement (EULA). To report copyright violations of AIA Contract Documents, e-mail The American Institute of Architects' legal counsel , <br /> copyright@aia.org. <br /> COMPLETING THE G703 FORM <br /> Heading: This information should be completed in a manner consistent with similar information on AIA Document G702, Application and Certificate for Payment. <br /> Columns A, B & C : These columns should be completed by identifying the various portions of the Project and their scheduled values consistent with the schedule <br /> of values submitted to the Architect at the commencement of the Project or as subsequently adjusted. The breakdown may be by sections of the Work or by <br /> Subcontractors and should remain consistent throughout the Project. Multiple pages should be used when required . <br /> Column C should be subtotaled at the bottom when more than one page is used and totaled on the last page. Initially, this total should equal the original <br />Contract <br /> Sum. The total of column C may be adjusted by Change Orders during the Project. <br /> Column D: Enter in this column the amount of completed Work covered by the previous application (columns D & E from the previous application). Values from <br /> column F (Materials Presently Stored) from the previous application should not be entered in this column. <br /> Column E: Enter here the value of Work completed at the time of this application , including the value of materials incorporated in the project that were listed <br />on <br /> the previous application under Materials Presently Stared (column F). <br /> Column F : Enter here the value of Materials Presently Stored for which payment is sought. The total of the column must be recalculated at the end of each pay <br /> period. This value covers both materials newly stored for which payment is sought and materials previously stored which are not yet incorporated into the Project. <br /> Mere payment by the Owner for stored materials does not result in a deduction from this column. Only as materials are incorporated into the Project is their value <br /> deducted from this column and incorporated into column E (Work Completed—This Period.) <br /> Column G: Enter here the total of columns D, E and F. Calculate the percentage completed by dividing column G by column C. <br /> Column H: Enter here the difference between column C (Scheduled Value) and column G (Total Completed and Stored to Date). <br /> Column I: This column is normally used only for contracts where variable retainage is permitted on aline-item basis. It need not be completed on projects where a <br /> constant retainage is withheld from the overall contract amount. <br /> Change Orders: Although Change Orders could be incorporated by changing the schedule of values each time a Change Order is added to the Project. this is not <br /> normally done. Usually, Change Orders are listed separately, either on their own G703 form or at the end of the basic schedule. The amount of the original <br /> contract adjusted by Change Orders is to be entered in the appropriate location on the G702 form . <br /> Construction Change Directives : Amounts not in dispute that have been included in Construction Change Directives should be incorporated into one or more <br /> Change Orders. Amounts remaining in dispute should be dealt with according to Section 7.3 in A201 . <br /> The following is an example of a Continuation Sheet for work in progress. Please note that dollar amounts shown below are for illustrative purposes only, and are not intended to <br /> reflect actual construction costs. <br /> A tl D L F G H I <br /> AWRK COMPLL I LU NIITRIALS TOTAL <br /> PRPlRTLY C01PL[IED RLI AINAGC <br /> ITEM SCIICDLLED IAOAi PRFVIOCS `+ 10 <br /> VO. DISCRIITION OF WORK VALCE AD PI IC STI06 IHIS PLRIOD SIORLU AND STORED 't IG-( ITAISH , 11 YpWApLE <br /> iNO <br /> IIN TO DATE IUTLI <br /> ID- 6 pORG [D+CFI ,GG. <br /> 1 MOBILIZATION 500e 5,000 0 0 5000 loo 0 <br /> 2 STUMP REMOVAL 5000 5,000 0 0 500 100 0 <br /> 3 EARTH WORK 150o0 10000 5,000 0 '5000 100 0 <br /> 4 LOWER RETAINING WALL mcw 0 5,000 0 5000 50 5,000 <br /> 5 CURBS d MISC. cow 5000 0 O 0 0 0 5000 <br /> 6 PAVING, UPPER DRIVE 20000 0 F 0 0 0 201000 <br /> 7 PAVING, LOWER DRIVE 20000 0 0 0 0 0 20000 <br /> 8 . PAVERS 20,000 0 0 10,000 100W 50 10000 <br /> 9 BRICKWORK 5000 0 0 0 0 0 5,000 <br /> 10 <br /> :1 105,000 20,000 10,000 10,000 40000 65.000 <br /> AIA Document G703TA — 1992. Copyright © 1963, 1965, 1966, 1967, 1970, 1978.. 1983 and 1992 by The American Institute of Architects. All rights reserved. WARNING: <br /> This AIA® Document is protected by U.S. Copyright Law and International Treaties. Unauthorized reproduction or distribution of this AIA® Document, or any <br /> portion of it, may result in severe civil and criminal penalties, and will be prosecuted to the maximum extent possible under the law. Purchasers are permitted to <br /> reproduce ten ( 10) copies of this document when completed. To report copyright violations of AIA Contract Documents, e-mail The American Institute of Architects legal <br /> counsel copyright@aia.org. <br />
The URL can be used to link to this page
Your browser does not support the video tag.