My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2004-294
CBCC
>
Official Documents
>
2000's
>
2004
>
2004-294
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/3/2016 10:13:54 AM
Creation date
9/30/2015 8:26:29 PM
Metadata
Fields
Template:
Official Documents
Official Document Type
Change Order
Approved Date
11/23/2004
Control Number
2004-294
Agenda Item Number
11.I.1
Entity Name
Barth Construction
Subject
Change Order No.2
North County Regional Park Phase II
Area
North County Regional Park
Project Number
0399
Archived Roll/Disk#
3224
Supplemental fields
SmeadsoftID
4740
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
8
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
BARTH <br /> Construction , Inc. <br /> General Contractor CGCO07847 <br /> October 25 , 2004 <br /> Chris Kafer WELDIndian River County Engineering [� <br /> 1840 25 "' Street NOV - 4 2004. <br /> Vero Beach , FI 32960 <br /> INDIAN RIVER COUNTY <br /> Re : North County Park Phase 1I - ENGVNEERING DIVISION <br /> Chris , <br /> As you requested the following is a summary of the damage and delays to the project associated with the <br /> two named storms . <br /> Damage attributed to Hurricane Frances <br /> Removed damaged and replaced all new dry-in material on Concession Stand <br /> Maintenance Building, Electrical Building and two small Shelters $ 11470 . 00 <br /> Missing wavy mirror & enclosure frame on playground $ 15763 . 49 — <br /> Repair damage to pond banks due to wash outs caused be excessive rains $ 89100 . 00 <br /> Due to the extensive amount of rainfall with the hurricane and the length of time to <br /> lower the water levels in the ponds and the site to dry out, the project was delayed a <br /> total of 13 calendar days <br /> ( 9/2 - 9/ 15) <br /> Damage attributed to Hurricane Jeanne <br /> Removed damaged and replaced all new dry -in material on Concession stand <br /> Maintenance building, electrical building and two small shelters $ 1 ,470 . 00 <br /> Repair and replace sports lighting ($ 5550 + $ 917) + tax $ 6919 . 69 — <br /> Note : this amount could increase if it is determined additional replace parts are needed . <br /> Due to the extensive amount of rainfall with the hurricane and the length of time to <br /> lower the water levels in the ponds and the site to dry out, the project was delayed a <br /> total of 15 calendar days <br /> (9/23 – 10/06 ) . <br /> 1717 Indian River Boulevard * Suite 202A * Vero Beach , Florida 32960 <br /> Phone : (772) 778- 3072 * Fax: (772) 770-3017 <br /> E -mail : info iribarthconstruction , corn * Internet : www. bartliconstruction . com <br /> F : \Projects\North County Park-Phase I1 \Correspondence\Owner\rain delay time extension request 10 .25 . 04. doc <br />
The URL can be used to link to this page
Your browser does not support the video tag.