My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2003-348.C
CBCC
>
Official Documents
>
2000's
>
2003
>
2003-348.C
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/23/2017 2:23:02 PM
Creation date
9/30/2015 7:10:56 PM
Metadata
Fields
Template:
Official Documents
Official Document Type
Contract
Approved Date
12/16/2003
Control Number
2003-348.C
Agenda Item Number
11.I.4
Entity Name
Barth Construction
Subject
Contract and Specifications Kitching Station Trailhead
Area
North County Regional Park
Project Number
0219
Bid Number
5099
Archived Roll/Disk#
3208
Supplemental fields
SmeadsoftID
3566
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
170
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
r ENGINEER in providing more extensive observation of the as provided in paragraph 13 .04, whether or not the Work is - <br /> Work. The responsibilities and authority and limitations fabricated, installed, or completed. <br /> thereon of any such Resident Project Representative and <br /> ' assistants will be as provided in paragraph 9 . 10 and in the 9 .07 Shop Drawings, Change Orders and Payments <br /> Supplementary Conditions , If OWNER designates another <br /> representative or agent to represent OWNER at the Site A. In connection with ENGINEER' s authority as to <br /> who is not ENGINEER' s Consultant, agent or employee, Shop Drawings and Samples, see paragraph 6. 17 . <br /> ' the responsibilities and authority and limitations thereon of <br /> such other individual or entity will be as provided in the B . In connection with ENGINEER' s authority as to <br /> Supplementary Conditions. Change Orders, see Articles 10, 11 , and 12 . <br /> ' 9 .04 Clarifications and Interpretations C. In connection with ENGINEER' s authority as to <br /> Applications for Payment, see Article 14 . <br /> A. ENGINEER will issue with reasonable promptness <br /> such written clarifications or interpretations of the require- 9 .08 Determinations for Unit Price Work <br /> ments of the Contract Documents as ENGINEER may <br /> determine necessary, which shall be consistent with the A. ENGINEER will determine the actual quantities <br /> intent of and reasonably inferable from the Contract Docu- and classifications of Unit Price Work performed <br /> by <br /> ments. Such written clarifications and interpretations will CONTRACTOR. ENGINEER will review with CON- <br /> be binding on OWNER and CONTRACTOR If OWNER TRACTOR the ENGINEER' s preliminary determinations <br /> and CONTRACTOR are unable to agree on entitlement to on such matters before rendering a written decision thereon <br /> or on the amount or extent, if any, of any adjustment in the (by recommendation of an Application for Payment <br /> or <br /> Contract Price or Contract Times, or both, that should be otherwise) . ENGINEER' s written decision thereon will be <br /> allowed as a result of a written clarification or interpre- final and binding (except as modified by ENGINEER <br /> to <br /> tation, a Claim may be made therefor as provided in reflect changed factual conditions or more <br /> accurate data) <br /> paragraph 10.05 . upon OWNER and CONTRACTOR, subject to the <br /> provisions of paragraph 10.05 . <br /> 9 .05 Authorized Variations in Work <br /> 9 . 09 Decisions on Requirements of Contract <br /> A. ENGINEER may authorize minor variations in the Documents and Acceptability of Work <br /> Work from the requirements of the Contract Documents <br /> which do not involve an adjustment in the Contract Price or A. ENGINEER will be the initial interpreter of the <br /> the Contract Times and are compatible with the design requirements of the Contract Documents and judge of the <br /> concept of the completed Project as a functioning whole as acceptability of the Work thereunder. Claims, disputes and <br /> indicated by the Contract Documents. These may be other matters relating to the acceptability of the Work, the <br /> accomplished by a Field Order and will be binding on quantities and classifications of Unit Price <br /> Work, the <br /> OWNER and also on CONTRACTOR, who shall perform interpretation of the requirements of the Contract <br /> the Work involved promptly. If OWNER and CONTRAC- Documents pertaining to the performance of the Work, and <br /> t TOR are unable to agree on entitlement to or on the amount Claims seeking changes in the Contract Price or Contract <br /> or extent, if any, of any adjustment in the Contract Price or Times will be referred initially to ENGINEER in writing, in <br /> Contract Times, or both, as a result of a Field Order, a accordance with the provisions of paragraph 10.05, <br /> with a <br /> Claim may be made therefor as provided in paragraph request for a formal decision. <br /> 10.05 . <br /> Paragraph 9.093 has been deleted in its entirety. <br /> ' 9 .06 Rejecting Defective Work Note: Will probably not want to delete this paragraph <br /> for a private project. <br /> A. ENGINEER will have authority to disapprove or <br /> reject Work which ENGINEER believes to be defective, or <br /> !1\I7"H D !'`f11�TTD A / Tl1D .....i .,:il w�F <br /> that ENGINEER believes will not produce a completed + + + . , a� a.. i a 4� <br /> Project that confornis to the Contract Documents or that <br /> will prejudice the integrity of the design concept of the <br /> ' completed Project as a functioning whole as indicated by <br /> mspecA to, <br /> the Contract Documents. ENGINEER will also have <br /> authority to require special inspection or testing of the Work have been meive4 by the ffmkifig <br /> ' 00700 - 30 <br />
The URL can be used to link to this page
Your browser does not support the video tag.