prior to CONTRACTOR's purchase thereof for - <br /> 13 . 02 Access to Work incorporation in the Work. Such inspections, tests, or <br /> approvals shall be performed by organizations acceptable to <br /> A. OWNER, ENGINEER, ENGINEER's Con- OWNER and ENGINEER <br /> sultants, other representatives and personnel of OWNER, <br /> independent testing laboratories, and governmental agencies E. If any Work (or the work of others) that is to be <br /> ' with jurisdictional interests will have access to the Site and inspected, tested, or approved is covered by CONTRAC- <br /> the Work at reasonable times for their observation, TOR without written concurrence of ENGINEER, it must, <br /> inspecting, and testing. CONTRACTOR shall provide if requested by ENGINEER, be uncovered for observation. <br /> them proper and safe conditions for such access and advise <br /> them of CONTRACTOR' s Site safety procedures and F. Uncovering Work as provided in paragraph <br /> programs so that they may comply therewith as applicable. 13 .03 .E shall be at CONTRACTOR' s expense unless CON- <br /> TRACTOR has given ENGINEER timely notice of <br /> 13 . 03 Tests and Inspections CONTRACTOR' s intention to cover the same and ENGI- <br /> NEER has not acted with reasonable promptness in <br /> A. CONTRACTOR shall give ENGINEER timely response to such notice. <br /> notice of readiness of the Work for all required inspections, <br /> tests, or approvals and shall cooperate with inspection and A new Paragraph 13 .03.G has been added. See the <br /> testing personnel to facilitate required inspections or tests. Supplementary Conditions. <br /> Paragraph 13.03.13 has been deleted and replaced with a 13 .04 Uncovering Work <br /> new paragraph. See the Supplementary Conditions. <br /> B . A. If any Work is covered contrary to the written <br /> ' request of ENGINEER, it must, if requested by ENGI- <br /> test � s required by two Gent Documents NEER, be uncovered for ENGINEER' s observation and <br /> co�w�a^pp`rvraxr='c:i'. ... .... ..� ..... ".,....».. . ... .... ............ <br /> exeept: replaced at CONTRACTOR' s expense. <br /> i €er- inspeetiens, tests, or- ap Parts of the last two sentences of paragraph 13.04.B <br /> have been deleted. <br /> B . If ENGINEER considers it necessary or advisable <br /> 2 . dmt 80sts ieanrfed- in smimantiAn mi4 that covered Work be observed by ENGINEER or inspect- <br /> ed or tested by others, CONTRACTOR, at ENGINEER' s <br /> 13 . 04 .B shaH be paid as pr-eN44ed in said paragrap request, shall uncover, expose, or otherwise make available <br /> 1 3 ,T,- ^fid for observation, inspection, or testing as ENGINEER may <br /> ' require, that portion of the Work in question, furnishing all <br /> 3 e we.3. ,:se speeifieally prreN4ded i the necessary labor, material, and equipment. If it is found that <br /> such Work is defective, CONTRACTOR shall pay all <br /> ' Claims, costs, losses, and damages (including but not <br /> limited to all fees and charges of engineers, architects, <br /> Paragraph 13.03.0 has been deleted in its entirety. attorneys, and other professionals and all court or arbitration <br /> Q if r aN „_ ve,.ulatiens of .,... ,-publ e bod• •-�, . :,, . or other dispute resolution costs) arising out of or relating <br /> to <br /> uisdi,.«:er-equffe any Wer-k (er- pat4 ♦t,e. of) speeifie, n. . such uncovering, exposure, observation, inspection, <br /> and <br /> testing, and of satisfactory replacement or reconstruction <br /> (including but not limited to all costs of repair or <br /> 1 replacement of work of others); and OWNER shall be <br /> entitled to an appropriate decrease in the Contract Price. If <br /> the parties are unable to agree as to the amount thereof, <br /> ' OWNER may make a Claim therefor as provided in <br /> paragraph 10.05 . If, however, such Work is not found to be <br /> D. CONTRACTOR shall be responsible for defective, CONTRACTOR shall be allowed <br /> arranging and obtaining and shall pay all costs in connection an extension of the Contract Times (or <br /> ' with any inspections, tests, or approvals required for Milestones), er— bed4 directly attributable to such <br /> OWNER's and ENGINEER' s acceptance of materials or uncovering, exposure, observation, inspection, testing, <br /> equipment to be incorporated in the Work; or acceptance of replacement, and reconstruction. If the parties are unable to <br /> ' materials, mix designs, or equipment submitted for approval <br /> 00700 - 37 <br />