prior to CONTRACTOR's purchase thereof for -
<br /> 13 . 02 Access to Work incorporation in the Work. Such inspections, tests, or
<br /> approvals shall be performed by organizations acceptable to
<br /> A. OWNER, ENGINEER, ENGINEER's Con- OWNER and ENGINEER
<br /> sultants, other representatives and personnel of OWNER,
<br /> independent testing laboratories, and governmental agencies E. If any Work (or the work of others) that is to be
<br /> ' with jurisdictional interests will have access to the Site and inspected, tested, or approved is covered by CONTRAC-
<br /> the Work at reasonable times for their observation, TOR without written concurrence of ENGINEER, it must,
<br /> inspecting, and testing. CONTRACTOR shall provide if requested by ENGINEER, be uncovered for observation.
<br /> them proper and safe conditions for such access and advise
<br /> them of CONTRACTOR' s Site safety procedures and F. Uncovering Work as provided in paragraph
<br /> programs so that they may comply therewith as applicable. 13 .03 .E shall be at CONTRACTOR' s expense unless CON-
<br /> TRACTOR has given ENGINEER timely notice of
<br /> 13 . 03 Tests and Inspections CONTRACTOR' s intention to cover the same and ENGI-
<br /> NEER has not acted with reasonable promptness in
<br /> A. CONTRACTOR shall give ENGINEER timely response to such notice.
<br /> notice of readiness of the Work for all required inspections,
<br /> tests, or approvals and shall cooperate with inspection and A new Paragraph 13 .03.G has been added. See the
<br /> testing personnel to facilitate required inspections or tests. Supplementary Conditions.
<br /> Paragraph 13.03.13 has been deleted and replaced with a 13 .04 Uncovering Work
<br /> new paragraph. See the Supplementary Conditions.
<br /> B . A. If any Work is covered contrary to the written
<br /> ' request of ENGINEER, it must, if requested by ENGI-
<br /> test � s required by two Gent Documents NEER, be uncovered for ENGINEER' s observation and
<br /> co�w�a^pp`rvraxr='c:i'. ... .... ..� ..... ".,....».. . ... .... ............
<br /> exeept: replaced at CONTRACTOR' s expense.
<br /> i €er- inspeetiens, tests, or- ap Parts of the last two sentences of paragraph 13.04.B
<br /> have been deleted.
<br /> B . If ENGINEER considers it necessary or advisable
<br /> 2 . dmt 80sts ieanrfed- in smimantiAn mi4 that covered Work be observed by ENGINEER or inspect-
<br /> ed or tested by others, CONTRACTOR, at ENGINEER' s
<br /> 13 . 04 .B shaH be paid as pr-eN44ed in said paragrap request, shall uncover, expose, or otherwise make available
<br /> 1 3 ,T,- ^fid for observation, inspection, or testing as ENGINEER may
<br /> ' require, that portion of the Work in question, furnishing all
<br /> 3 e we.3. ,:se speeifieally prreN4ded i the necessary labor, material, and equipment. If it is found that
<br /> such Work is defective, CONTRACTOR shall pay all
<br /> ' Claims, costs, losses, and damages (including but not
<br /> limited to all fees and charges of engineers, architects,
<br /> Paragraph 13.03.0 has been deleted in its entirety. attorneys, and other professionals and all court or arbitration
<br /> Q if r aN „_ ve,.ulatiens of .,... ,-publ e bod• •-�, . :,, . or other dispute resolution costs) arising out of or relating
<br /> to
<br /> uisdi,.«:er-equffe any Wer-k (er- pat4 ♦t,e. of) speeifie, n. . such uncovering, exposure, observation, inspection,
<br /> and
<br /> testing, and of satisfactory replacement or reconstruction
<br /> (including but not limited to all costs of repair or
<br /> 1 replacement of work of others); and OWNER shall be
<br /> entitled to an appropriate decrease in the Contract Price. If
<br /> the parties are unable to agree as to the amount thereof,
<br /> ' OWNER may make a Claim therefor as provided in
<br /> paragraph 10.05 . If, however, such Work is not found to be
<br /> D. CONTRACTOR shall be responsible for defective, CONTRACTOR shall be allowed
<br /> arranging and obtaining and shall pay all costs in connection an extension of the Contract Times (or
<br /> ' with any inspections, tests, or approvals required for Milestones), er— bed4 directly attributable to such
<br /> OWNER's and ENGINEER' s acceptance of materials or uncovering, exposure, observation, inspection, testing,
<br /> equipment to be incorporated in the Work; or acceptance of replacement, and reconstruction. If the parties are unable to
<br /> ' materials, mix designs, or equipment submitted for approval
<br /> 00700 - 37
<br />
|