E . CONTRACTOR has obtained and carefully studied (or assumes responsibility for having
<br /> done so) all additional or supplementary examinations , investigations , explorations , tests ,
<br /> studies , and data concerning conditions (surface , subsurface , and Underground Facilities )
<br /> at or contiguous to the Site which may affect cost , progress , or performance of the Work
<br /> or which relate to any aspect of the means , methods , techniques , sequences , and
<br /> ' procedures of construction to be employed by CONTRACTOR , including applying the
<br /> specific means , methods , techniques , sequences , and procedures of construction , if any,
<br /> expressly required by the Contract Documents to be employed by CONTRACTOR , and
<br /> safety precautions and programs incident thereto
<br /> F . CONTRACTOR does not consider that any further examinations , investigations ,
<br /> explorations , tests , studies , or data are necessary for the performance of the Work at the
<br /> Contract Price , within the Contract Times , and in accordance with the other terms and
<br /> conditions of the Contract Documents .
<br /> ' G . CONTRACTOR is aware of the general nature of work to be performed by OWNER and
<br /> others at the Site that relates to the Work as indicated in the Contract Documents .
<br /> H . CONTRACTOR has correlated the information known to CONTRACTOR , information and
<br /> observations obtained from visits to the Site , reports and drawings identified in the
<br /> Contract Documents , and all additional examinations , investigations , explorations , tests ,
<br /> studies , and data with the Contract Documents .
<br /> I . CONTRACTOR has given ENGINEER written notice of all conflicts , errors , ambiguities , or
<br /> discrepancies that CONTRACTOR has discovered in the Contract Documents , and the
<br /> written resolution thereof by ENGINEER is acceptable to CONTRACTOR .
<br /> J . The Contract Documents are generally sufficient to indicate and convey understanding of
<br /> all terms and conditions for performance and furnishing of the Work .
<br /> ' ARTICLE 9 = CONTRACT DOCUMENTS
<br /> 9 . 01 Contents
<br /> A. The Contract Documents consist of the following :
<br /> 1 . This Agreement ( pages 00520- 1 to00520-8 , inclusive ) ;
<br /> ' 2 . Performance Bond (pages 00610- 1 to 00610-5 , inclusive ) ;
<br /> 3 . Payment Bond (pages 00612- 1 to 00612-5 , inclusive ) ;
<br /> ' 4 . General Conditions ( pages 00700- 1 to 00700-75 , inclusive ) ;
<br /> ' 5 . Supplementary Conditions ( pages 00800i to 00800- 14 , inclusive ) ;
<br /> 6 . Specifications as listed in the table of contents of the Project Manual ;
<br /> 7 . Drawings consisting of a cover sheet and sheets numbered through ,
<br /> inclusive , with each sheet bearing the following general title : ,
<br /> 0219-00520 - Agreement (Public Works ).doc
<br /> 00520 - 5