Laserfiche WebLink
G7AIA 04 2000 <br /> 2000 <br /> Document G70 <br /> Certificate of Substantial Completion <br /> PROJECT: PROJECT NUMBER: / OWNER: ❑ <br /> (Name and address) : CONTRACT FOR: General Construction ARCHITECT: ❑ <br /> IRC Fire Station # 12 CONTRACT DATE: 9/ 16/08 <br /> 3620 49" Street CONTRACTOR: ❑ <br /> Vero Beach, FL 32960 <br /> TO OWNER: TO CONTRACTOR: FIELD: ❑ <br /> (Name and address) : (Name and address) : OTHER: ❑ <br /> Indian River County Barth Construction, Inc. <br /> 1840 25th Street 1717 Indian River Blvd , Suite 202A <br /> Vero Beach , FL 32960 Vero Beach, FL 32960 <br /> PROJECT OR PORTION OF THE PROJECT DESIGNATED FOR PARTIAL OCCUPANCY OR USE SHALL INCLUDE: <br /> The Work performed under this Contract has been reviewed and found, to the Architect' s best knowledge, information and belief, <br /> to be substantially complete. Substantial Completion is the stage in the progress of the Work when the Work or designated <br /> portion is sufficiently complete in accordance with the Contract Documents so that the Owner can occupy or utilize the Work for <br /> its intended use. The date of Substantial Completion of the Project or portion designated above is the date of issuance established <br /> by this Certificate, which is also the date of commencement of applicable warranties required by the Contract Documents, except <br /> as stated below : <br /> Warranty Dat ommencement <br /> Salue <br /> Edlund, Dritenbas, Binkley, / p <br /> Architects I � )670ar12 l6111 2oo 7 <br /> ARCHITECT BY DATE OF ISSUANCE <br /> A list of items to be completed or corrected is attached hereto. The failure to include any items on such list does not alter the <br /> responsibility of the Contractor to complete all Work in accordance with the Contract Documents. Unless otherwise agreed to in <br /> writing, the date of commencement of warranties for items on the attached list will be the date of issuance of the final Certificate <br /> of Payment or the date of final payment. <br /> Cost estimate of Work that is incomplete or defective: $0. 00 �jr �5'� ( �D��� • <br /> The Contractor will complete or correct the Work on the list of items attached hereto within Zero (0) days from the above date of <br /> Substantial Completion. <br /> Barth Construction, Inc. `pl/,?j�� � <br /> CONTRACTOR Y d DATT— <br /> The Owner accepts the Work or designated portion as substantially complete and will assume full possession at (time ) on <br /> (date). <br /> Indian River County <br /> OWNER BY DATE <br /> The responsibilities of the Owner and Contractor for security, maintenance, heat, utilities, damage to the Work and insurance <br /> shall be as follows : <br /> (Note: Owner 's and Contractor 's legal and insurance counsel should determine and review insurancerequirements and am:/9 <br /> / <br /> coverage.)/ill �pe"1,7o al ev sh , //71l/lt 7,wezF C��A� l 11 <br /> f ,11, G`5 <br /> o4 <br /> ll /, rs kco W,. '. 1h. O�v s .E �s�di/.,1� vs 40 �' r� oh <br /> AIA Document 13704' — 2000. Copyright ® 19630 1978, 1992 and 2000 by The American Institute of Architects. All rights reserved. WARNING . '11 is <br /> AIA <br /> Clorunleot is proterted by U . S. Copyright Law and International Treaties. Unauthorized reproduction or distribution of this AIA' Uocerrnent, ur any <br /> portion of it, "lay result in severe civil .anti crirninal penalties, and will be prosecuted to the maximum extent possible under the law. This <br />document <br /> was produced by AIA software at 16: 10: 58 on 12/02/2009 under Order No. 1000396135_1 which expires on 04/2212010, and is not for resale. ( 1836272966) <br /> User Notes: <br />