Laserfiche WebLink
§ 1 . 3 .4 Submission or distribution of the Design /Builder' s documents to meet official <br /> regulatory requirements or for similar purposes in connection with the Project is not to <br /> be construed as publication in derogation of the rights reserved in Section 1 . 3 . 1 . <br /> ARTICLE 2 OWNER <br /> § 2 . 1 The Owner shall designate a representative authorized to act on the Owner' s <br /> behalf with respect to the Project . The Owner or such authorized representative shall <br /> examine documents submitted by the Design/Builder and shall render decisions in a <br /> timely manner and in accordance with the schedule accepted by the Owner . The Owner <br /> may obtain independent review of the Contract Documents by a separate architect , <br /> engineer, contractor or cost estimator under contract to or employed by the Owner . <br /> Such independent review shall be undertaken at the Owner' s expense in a timely <br /> manner and shall not delay the orderly progress of the Work . <br /> § 2 . 2 The Owner may appoint an on -site project representative to observe the Work and <br /> to have such other responsibilities as the Owner and Design/Builder agree in writing . <br /> § 2 . 3 The Owner shall cooperate with the Design /Builder in securing building and other <br /> permits , licenses and inspections . The Owner shall not be required to pay the fees for <br /> such permits , licenses and inspections unless the cost of such fees is excluded from the <br /> Design /Builder' s Proposal . <br /> § 2 .4 The Design/ Builder 9wne shall furnish services of land surveyors , geotechnical <br /> engineers and other consultants for subsoil , air and water conditions , in addition to <br /> those provided under the Part 1 Agreement , when such services are deemed necessary <br /> by the Design/Builder to properly carry out the design services required by this Part 2 <br /> Agreement . <br /> § 2 . 5 The Owner shall disclose , to the extent known to the Owner , the results and <br /> reports of prior tests , inspections or investigations conducted for the Project involving : <br /> structural or mechanical systems ; chemical , air and water pollution ; hazardous <br /> materials ; or other environmental and subsurface conditions . The Owner shall disclose <br /> all information known to the Owner regarding the presence of pollutants at the Project' s <br /> site . <br /> OwneF may requiFe to verify the , <br /> § 2 . 7 Those services , information , surveys and reports required by Sections 2 . 4 and 2 . 5 <br /> thFough 2 ..6 which are within the Owner' s control shall be furnished at the Owner' s <br /> expense , and the Design /Builder shall be entitled to rely upon the accuracy and <br /> completeness thereof, except to the extent the Owner advises the Design /Builder to the <br /> contrary in writing . <br /> theFeef <br /> �y � er the QwneF shall the additiGRalGGSt , <br /> eX oth <br /> a6 eFwirJe stipulated in + him+ PaFt 2 AgFeernen+ <br /> 4 <br />