My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2008-247
CBCC
>
Official Documents
>
2000's
>
2008
>
2008-247
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/8/2016 10:19:31 AM
Creation date
10/1/2015 12:28:03 AM
Metadata
Fields
Template:
Official Documents
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
24
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
equipment , tools , construction equipment and machinery , water , heat , utilities , <br /> transportation and other facilities and services necessary for proper execution and <br /> completion of the Work , whether temporary or permanent and whether or not <br /> incorporated or to be incorporated in the Work . <br /> § 3 . 2 . 6 The Design / Builder shall be responsible for all construction means , methods , <br /> techniques , sequences and procedures , and for coordinating all portions of the Work <br /> under this Part 2 Agreement . <br /> § 3 . 2 .7 The Design/Builder shall keep the Owner informed of the progress and quality of <br /> the Work . <br /> § 3 . 2 . 8 The Design/ Builder shall be responsible for correcting Work which does not <br /> conform to the Contract Documents . <br /> § 3 . 2 . 9 The Design/Builder warrants to the Owner that materials and equipment <br /> furnished under the Contract will be of good quality and new unless otherwise required <br /> or permitted by the Contract Documents , that the construction will be free from faults <br /> and defects , and that the construction will conform with the requirements of the Contract <br /> Documents . Construction not conforming to these requirements , including substitutions <br /> not properly approved by the Owner , shall be corrected in accordance with Article 9 . <br /> § 3 . 2 . 10 The Design/Builder shall pay all sales , consumer , use and similar taxes which <br /> had been legally enacted at the time the Design/Builder' s Proposal was first submitted <br /> to the Owner , and shall secure and pay for building and other permits and governmental <br /> fees , licenses and inspections necessary for the proper execution and completion of the <br /> Work which are either customarily secured after execution of a contract for construction <br /> or are legally required at the time the Design /Builder' s Proposal was first submitted to <br /> the Owner. <br /> § 3 . 2 . 11 The Design/Builder shall comply with and give notices required by laws , <br /> ordinances , rules , regulations and lawful orders of public authorities relating to the <br /> Project . <br /> § 3 . 2 . 12 The Design/Builder shall pay royalties and license fees for patented designs , <br /> processes or products . The Design/ Builder shall defend suits or claims for infringement <br /> of patent rights and shall hold the Owner harmless from loss on account thereof, but <br /> shall not be responsible for such defense or loss when a particular design , process or <br /> product of a particular manufacturer is required by the Owner. However , if the <br /> Design/ Builder has reason to believe the use of a required design , process or product is <br /> an infringement of a patent , the Design/Builder shall be responsible for such loss unless <br /> such information is promptly furnished to the Owner . <br /> § 3 . 2 . 13 The Design/ Builder shall keep the premises and surrounding area free from <br /> accumulation of waste materials or rubbish caused by operations under this Part 2 <br /> Agreement . At the completion of the Work , the Design/ Builder shall remove from the <br /> site waste materials , rubbish , the Design/ Builder' s tools , construction equipment , <br /> machinery , and surplus materials . <br /> 6 <br />
The URL can be used to link to this page
Your browser does not support the video tag.