My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2008-300B
CBCC
>
Official Documents
>
2000's
>
2008
>
2008-300B
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/11/2016 1:51:33 PM
Creation date
10/1/2015 12:37:55 AM
Metadata
Fields
Template:
Official Documents
Official Document Type
Agreement
Approved Date
09/16/2008
Control Number
2008-300B
Agenda Item Number
15.A.3.2
Entity Name
Barth Construction,Inc.
Subject
Gifford Fire Station #12 Part II Agreement
Area
3620 49th St.
Supplemental fields
SmeadsoftID
7584
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
28
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
. 5 additional costs of supervision and field office personnel directly attributable <br /> to the change ; and fees paid to the Architect , engineers and other <br /> professionals . <br /> § 8 . 3 . 3 Pending final determination of cost to the Owner , amounts not in dispute may be <br /> included in Applications for Payment . The amount of credit to be allowed by the <br /> Design/Builder to the Owner for deletion or change which results in a net decrease in <br /> the Contract Sum will be actual net cost . When both additions and credits covering <br /> related Work or substitutions are involved in a change , the allowance for overhead and <br /> profit shall be figured on the basis of the net increase , if any , with respect to that <br /> change . <br /> § 8 . 3 . 4 When the Owner and the Design/Builder agree upon the adjustments in the <br /> Contract Sum and Contract Time , such agreement shall be effective immediately and <br /> shall be recorded by preparation and execution of an appropriate Change Order . <br /> § 8 .4 MINOR CHANGES IN THE WORK <br /> § 8 .4 . 1 The Design /Builder shall have authority to make minor changes in the <br /> Construction Documents and construction consistent with the intent of the Contract <br /> Documents when such minor changes do not involve adjustment in the Contract Sum or <br /> extension of the Contract Time , The Design/Builder shall promptly inform the Owner , in <br /> writing , of minor changes in the Construction Documents and construction . <br /> § 8 . 5 CONCEALED CONDITIONS <br /> § 8 . 5 . 1 If conditions are encountered at the site which are ( 1 ) subsurface or otherwise <br /> concealed physical conditions which differ materially from those indicated in the <br /> Contract Documents , or (2 ) unknown physical conditions of an unusual nature which <br /> differ materially from those ordinarily found to exist and generally recognized as <br /> inherent in construction activities of the character provided for in the Contract <br /> Documents , then notice by the observing party shall be given to the other party promptly <br /> before conditions are disturbed and in no event later than 21 days after first observance <br /> of the conditions . The Contract Sum shall be equitably adjusted for such concealed or <br /> unknown conditions by Change Order upon claim by either party made within 21 days <br /> after the claimant becomes aware of the conditions . <br /> § 8 . 6 REGULATORY CHANGES <br /> § 8 . 6 . 1 The Design/Builder shall be compensated for changes in the construction <br /> necessitated by the enactment or revisions of codes , laws or regulations subsequent to <br /> the submission of the Design/Builder's Proposal . <br /> ARTICLE 9 CORRECTION OF WORK <br /> § 9 . 1 The Design/ Builder shall promptly correct Work rejected by the Owner or known <br /> by the Design/Builder to be defective or failing to conform to the requirements of the <br /> Contract Documents , whether observed before or after Substantial Completion and <br /> whether or not fabricated , installed or completed . The Design/Builder shall bear costs <br /> of correcting such rejected Work , including additional testing and inspections . <br /> § 9 . 2 If , within one ( 1 ) year after the date of Substantial Completion of the Work or , after <br /> the date for commencement of warranties established in a written agreement between <br /> the Owner and the Design/Builder , or by terms of an applicable special warranty <br /> required by the Contract Documents , any of the Work is found to be not in accordance <br /> 15 <br />
The URL can be used to link to this page
Your browser does not support the video tag.