My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2008-300B
CBCC
>
Official Documents
>
2000's
>
2008
>
2008-300B
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/11/2016 1:51:33 PM
Creation date
10/1/2015 12:37:55 AM
Metadata
Fields
Template:
Official Documents
Official Document Type
Agreement
Approved Date
09/16/2008
Control Number
2008-300B
Agenda Item Number
15.A.3.2
Entity Name
Barth Construction,Inc.
Subject
Gifford Fire Station #12 Part II Agreement
Area
3620 49th St.
Supplemental fields
SmeadsoftID
7584
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
28
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
ATTACHMENT "B" <br /> Station # 12 <br /> Plan Sheets <br /> Sheet # Title Date <br /> Cover Sheet 4/ 10/08 <br /> ABB Abbreviations/General Notes 4/ 10/08 <br /> ACC Accessibility Details 4/ 10/08 <br /> A- 1 Proposed Site Plan 4/ 10/08 <br /> A- 1R Building Plan 4/ 10/08 <br /> A-2 1 /8 " Building Plan 4/ 10/08 <br /> A-2A Pressure at Doors and Windows 4/ 10/08 <br /> A- 3 '/4" Partial Floor Plan 4/ 10/08 <br /> A-4 '/4" Partial Floor Plan 4/ 10/08 <br /> A- 5 Elevations 4/ 10/08 <br /> A- 6 Elevations 4/ 10/08 <br /> A-7 Roof Plan 4/ 10/08 <br /> A- 8 Reflected Ceiling Plan 4/ 10/08 <br /> A-9 Sections and Details 4/ 10/08 <br /> A- 10 Sections and Details 4/05 /08 <br /> A- 11 Schedules 4/ 10/08 <br /> A- 12 Interior Elevations and Details 4/ 10/08 <br /> A- 13 Details 4/ 10/08 <br /> A- 14 Details 4/ 10/08 <br /> A- 15 Details 4/ 10/08 <br /> I- 1 Interiors Plan 4/ 10/08 <br /> S - 1 Foundation Plan and Details 4/ 10/08 <br /> S -2 Roof Framing Plan , Details and Schedules 4/ 10/08 <br /> S - 3 Structural Notes and Details 4/ 10/08 <br /> M- 1 Floor Plan - HVAC 4/ 10/08 <br /> M-2 Mechanical Equipment Schedule and Details 4/ 10/08 <br /> M- 3 Kitchen Hood Schedule and Details 4/ 10/08 <br /> E- 1 Electrical Symbol Legend, Schedule and Notes 4/ 10/08 <br /> E-2 Electrical Site Plan — Lighting 4/ 10/08 <br /> E-2A Electrical Site Plan- Site Lighting Photometric 4/ 10/08 <br /> E-3 Electrical Floor Plan - Lighting 4/ 10/08 <br /> E-4 Electrical Floor Plan — Power and Systems 4/ 10/08 <br /> E- 5 Panel Schedule , Load Calculation, Details 4/ 10/08 <br /> E-6 Electrical One Line and Rise Diagram 4/ 10/08 <br /> P - 1 Floor Plan — Plumbing 4/ 10/08 <br /> P-2 Sanitary and Domestic Water Riser Diagrams 4/ 10/08 <br /> P -4 Schedules and Details - Plumbing 4/ 10/08 <br /> 23 <br />
The URL can be used to link to this page
Your browser does not support the video tag.