Laserfiche WebLink
§ 1 . 3 . 4 Submission or distribution of the Design / Builder' s documents to meet official <br /> regulatory requirements or for similar purposes in connection with the Project is not to <br /> be construed as publication in derogation of the rights reserved in Section 1 . 3 . 1 . <br /> ARTICLE 2 OWNER <br /> § 2 . 1 The Owner shall designate a representative authorized to act on the Owner' s <br /> behalf with respect to the Project . The Owner or such authorized representative shall <br /> examine documents submitted by the Design/Builder and shall render decisions in a <br /> timely manner and in accordance with the schedule accepted by the Owner. The Owner <br /> may obtain independent review of the Contract Documents by a separate architect, <br /> engineer , contractor or cost estimator under contract to or employed by the Owner . <br /> Such independent review shall be undertaken at the Owner' s expense in a timely <br /> manner and shall not delay the orderly progress of the Work . <br /> § 2 . 2 The Owner may appoint an on - site project representative to observe the Work and <br /> to have such other responsibilities as the Owner and Design/ Builder agree in writing . <br /> § 2 . 3 The Owner shall cooperate with the Design/ Builder in securing building and other <br /> permits , licenses and inspections . The Owner shall not be required to pay the fees for <br /> such permits , licenses and inspections unless the cost of such fees is excluded from the <br /> Design/Builder's Proposal . <br /> § 2 . 4 The Design /Builder QWRe shall furnish services of land surveyors , geotechnical <br /> engineers and other consultants for subsoil , air and water conditions , in addition to <br /> those provided under the Part 1 Agreement , when such services are deemed necessary <br /> by the Design/Builder to properly carry out the design services required by this Part 2 <br /> Agreement . <br /> § 2 . 5 The Owner shall disclose , to the extent known to the Owner , the results and <br /> reports of prior tests , inspections or investigations conducted for the Project involving : <br /> structural or mechanical systems ; chemical , air and water pollution ; hazardous <br /> materials ; or other environmental and subsurface conditions . The Owner shall disclose <br /> all information known to the Owner regarding the presence of pollutants at the Project' s <br /> site . <br /> Owner mei regUire to verify the design /Buildei:' Annlieatienc {Gr ❑ ayn; ent <br /> § 2 . 7 Those services , information , surveys and reports required by Sections 2 . 4 and 2 . 5 <br /> thFough which are within the Owner' s control shall be furnished at the Owner' s <br /> expense , and the Design/Builder shall be entitled to rely upon the accuracy and <br /> completeness thereof, except to the extent the Owner advises the Design/Builder to the <br /> contrary in writing . <br /> eXGept as eetth • rice stipulated in this Dart 2 Agreement . <br /> 4 <br />