My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2006-205
CBCC
>
Official Documents
>
2000's
>
2006
>
2006-205
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/19/2016 3:59:29 PM
Creation date
9/30/2015 9:47:45 PM
Metadata
Fields
Template:
Official Documents
Official Document Type
Work Order
Approved Date
06/13/2006
Control Number
2006-205
Agenda Item Number
7.M.
Entity Name
Applied Technology and Management, Inc.
Subject
Work Order #2 - SBeach preservation Plan, sectors 1 & 2
Supplemental fields
SmeadsoftID
5679
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
15
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Indian River County Beach Restoration Project - ATM Conwad AmaMn_m at <br /> Ambersand Segment Biological Monitoring and Tilling <br /> Subeontraotor H - Subcorroa r N - <br /> Suboorrtnetors3 . 9ubeontnelor N • University of <br /> Conllnenlal SheN Subcontractor H . Ecological Inwalar Ross Subeontnolor b6 • Centnl Floods Total Subs. Management Total Task <br /> Task TASK DESCRIPTION AND BREAKDOWN Assoc. Coastal EcoCnu Aesxlates Ino. Onu Ino. Beach Tillln TBD UCF) Subocrdraelor & Adnin <br /> ATM Budget <br /> 1 Slele Ical Monitoring on Neanhon <br /> 1.1 FISItl/OE1]3184.00 1"319400 17319A0 190513A0 <br /> 1.2 OAC and antlA en Coordination 55U0 18550W 135500 3 2040500 <br /> Task i TOTAL c ST 181 7=6 18171.10 210 813.10 <br /> 2 Post-Consbuelion Tulle Nestina Meniterin 61011t)7 to 143110 <br /> 2.1 Su MOMon2475.00 A 2,47500 S 247.50 a 27 50 <br /> 2.2 Dai Nene Surve U819.00 I a 41,013.90 $ 4151.30 a 45771.30 <br /> 23 1 N"t MMM ant Montionm 25 <br /> 2/ D Meru nom - Mo Re 539].25 4331. S /3 .i 178/.33 <br /> 5,387,26 538.73 5,m," <br /> 25 Year ni Row" 843 .00 8 35.00 81350 078.50 <br /> Task 2 TOTAL COST N 211.60 024.16 N 28&N <br /> 3 Neanhers Tunis Monitodn Fall 2003 - 5 do 06 M <br /> .1 Fietl Surves 12.w N 1 0000 126000 13880.00 <br /> 32 Dela AN is 800. 80000 80.00 00 <br /> 33 Re RPro nlion Task 3 TOTAL COST 230000 S 2300.00 30. 2530.Op <br /> 15 700.00 1 670.00 1 1 17 270.00 <br /> 1 1 Juvenile Oresn Turtle Natting Studies <br /> inctne Umms300 .00 3000000 3000.00 33000.00 <br /> TaskITOTAL COST 30 DD0.00 3000.00 39000.N <br /> 6 Beseh Tlllin <br /> Ti 10 00 10000.00 1000.00 1100000 <br /> Taak6TOTAL COST 1000000 10NN 11000N <br /> Pro ect Totals • Subs, ATM Labor ATM ODC's and Overall 307 685.50 $ 30 768.55 $ 338 454.05 <br /> roaxa7,moa <br />
The URL can be used to link to this page
Your browser does not support the video tag.