My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2003-015
CBCC
>
Official Documents
>
2000's
>
2003
>
2003-015
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/2/2016 11:51:44 AM
Creation date
9/30/2015 6:15:39 PM
Metadata
Fields
Template:
Official Documents
Official Document Type
Amendment
Approved Date
01/21/2003
Control Number
2003-015
Agenda Item Number
11.G.1.
Entity Name
Applied Technology and Management, Inc.
Subject
Beach preservation plan-Amendment #5 to Engineering design & permitting
Archived Roll/Disk#
3160
Supplemental fields
SmeadsoftID
2801
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
10
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Indian River County Beach Restoration Project- + <br /> Sectors 12 <br /> (Construction Phase Services) <br /> Ecological <br /> Associates, Total ATM Other <br /> U.S. Imaging, Inc.(Sea turtle Subcontractor ATM Total Direct Costs Total Task <br /> Task TASK DESCRIPTION AND BREAKDOWN Inc. monitors USI and EAI Labor (ODC's) Budget <br /> Periodic Site Inspections(one day/week for 12 weeks and a total <br /> 9.1 not to exceed six 6 "on-call"days)and writeu - 24,240 Z979 27.219 <br /> 9.2 Pre-Construction Conference two meetings in Vero Beach - 4,430. 128 4,558 <br /> Weekly Construction Progress Meetings(12 weeks total)& <br /> 9.3 distribute meeting minutes to County, Contractor and FDEP - 7.560 292 7,852 <br /> 9.4 Beach Profile Modified Construction Template& Prowess Surveys - 2Z580 174 22,754 <br /> 9.5 Substantial Completion Inspection - 2,820 105 2.925 <br /> 9.6 Production of As-Built Drawings - 13,210 1.330 14,540 <br /> 9.7 Sea Turtle Monitoring of Beachfill Area 3/01/03-4/30/03 - 1.820 <br /> 9.7.1 Pre-Construction Coordination Meeting to coincide w/formal precon 710 710 - <br /> 9.7.2 1 Dailv Nesting SuDW March 1 through April 30 8.732 8,7321 -$ <br /> Nest Relocation&Marking assumes 20 loggerheadnests an <br /> 9.7.3 leatherback nest will require relocation during construction 1,980 1,980 - <br /> 9.8 Dudnq and Post-Construction Aerial Photography two overflights) 12,480 12,48 970 <br /> TOTAL FEES-CONSTRUCTION PHASE SERVICES $ 12,480_1 $ 11,422 1 $ 23 902 $ 77,630 $ 5,008 1 $ 106 540 <br /> IRC Ambersand ATM Construction Phase Services reduced participation Jan 142003 with additional consideration Justifying budget reduction.)ds1/15/03 <br />
The URL can be used to link to this page
Your browser does not support the video tag.