My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2003-044
CBCC
>
Official Documents
>
2000's
>
2003
>
2003-044
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/27/2016 2:00:30 PM
Creation date
9/30/2015 6:22:11 PM
Metadata
Fields
Template:
Official Documents
Official Document Type
Amendment
Approved Date
02/18/2003
Control Number
2003-044
Agenda Item Number
11.G.2.
Entity Name
Dial Cordy and Associates, Inc.
Subject
Beach Preservation Sectors 1 & 2 Amendment No. 4
Archived Roll/Disk#
3160
Supplemental fields
SmeadsoftID
3166
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
28
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Table 2 . Summary of Monitoring Efforts <br /> ACTIVITY FREQUENCY TRANSECT TRANSECT TRANSECT # OF VARIABLE (S) <br /> r ORIENTATION LENGTH LOCATIONS STATIONS MEASURED <br /> Sediment Every 500 feet 2 per <br /> Compaction Annual Shore Variable — R4 to R- 17 Transect, Compaction <br /> Post- Dune Crest 3 Replicates <br /> (Section 2 . 1 ) <br /> Monitoring Construction Perpendicular To MHW at 3 Depths (PSI) <br /> p <br /> er <br /> Escarpment Annual Post- Scarp Height <br /> 1 Formation Construction, None None (Inches) <br /> Weekl m(Section 2 .2) y (Continuous) <br /> nestinLy season <br /> Marine Turtle Project: Emergences, <br /> Nesting Annual Post- None None R-5 to R- 17 Continuous Nests, <br /> Monitoring Construction (Continuous) Control: Reproductive <br /> Section 2 .3 R-22 to R-26 success <br /> Sessile Reef Annual Pre- Project: <br /> Biota Shore R418, 12116 3 per Species <br /> (Section and Post- Perpendicular 2000 feet Control: transect richness, <br /> 3 . 1 . 1 Construction R-22125 Percent cover <br /> Reef Annual Pre- Project: <br /> Condition and Post- Shore 2000 feet R498, 12116 Continuous Qualitative <br /> Video Construction Perpendicular Control: video <br /> R-22,25 <br /> Fish Project: <br /> Population Annual Pre- Shore R-B, 12, 16 3 per Species <br /> Perpendicular Control: transect <br /> I Censusing and Post- 2000 feet richness and <br /> (Section Construction onroabundances <br /> 3 . 1 .2) R-22,25 <br /> Marine Turtle <br /> Netting Annual Post- Species <br /> Studies Construction None None R- 11 to R- 19 None composition, <br /> (Section CpUE <br /> 3 .2 . 1 <br /> Marine Turtle <br /> Nearshore Semi-Annual Shore Parallel R- 10 to R-20, Species <br /> Transect pre- and Post- At 300, 600, and 3 Kilometers R-62 to R-72, Continuous Composition, <br /> Construction 1200 feet R- 109 to R- Relative <br /> (Section truction offshore 119 Abundance <br /> 3 .2 .2 <br /> Turbidity During <br /> Monitoring Construction None None TBD TBD Turbidity <br /> Section 3 .3 (NTS <br /> Dredge <br /> Pipeline Pre- and Post- Shore Length of Along Pipeline Continuous Qualitative <br /> Corridor Construction Perpendicular Pipeline Corridor Video <br /> Monitoring <br /> 6 ETOF To First R-5 6 7 8 9 <br /> IMonitoring Post- Shore Position of <br /> (Section Construction Perpendicular Exposed 109 11 , 12, 132 At ETOF ETOF <br /> 3 .4 .2) Hardbottom 145 152 16, 17 <br /> 6 <br />
The URL can be used to link to this page
Your browser does not support the video tag.