Laserfiche WebLink
A. Meet with the Park Manager or his designee to locate the dredge pipeline. <br /> B. Coordinate any staging areas in the Park with the Park Manager. Fuel will be kept in a <br /> double walled container with a catch basin, and refueling operations will be conducted within the <br /> approved staging area only. <br /> C. Access the beach at points designated by the Park Manager to protect Park facilities and plants. <br /> Access at Crossover (R-2.5) must have the approval of the United States Fish and Wildlife Service. <br /> D. Provide signage to prevent access to the staging area and into the worksite. <br /> E. Take all necessary safety measures as determined by Park Manager to ensure the safety of Park <br /> visitors during all construction processes. Provide appropriate signage when requested. <br /> F. Meet with the Park Manager or his designee regarding after hour permits for entering the Park after <br /> Park operating hours. <br /> G. Follow the Park Manager's instructions concerning special park rules with special regards to <br /> protection of the Park's plants and animals, vehicular traffic and Park visitors. <br /> H. Stop at the ranger station upon entering the Park. <br /> L Provide and maintain crossings for vehicular and pedestrian access over sections of the pipeline not <br /> within the project work zone. The crossing locations will be determined on site by GRANTEE and <br /> Park Manager. Additional crossings or underpasses for shorebirds may be required in the event that <br /> shorebirds nest and fledge young on the landward side of the pipeline. <br /> J. Work cooperatively with the Park Manager and Park biologists to resolve issues regarding safety, <br /> access, or environmental concerns resulting from this project. <br /> K. Meet with the Park Manager or his designee during the construction phase of the project. The time <br /> and frequency of such meeting shall be agreed to by the Park Manager and GRANTEE' S <br /> representative prior to commencement of construction. <br /> L. Establish a safe zone around the area to be worked by heavy equipment. <br /> M. Not undertake any activity within 200 feet of nesting shorebirds, including, but not limited to, least <br /> tems, wilson' s plovers and snowy plovers. <br /> N. Construction may not commence in any area which sea turtle nests are known to exist during the <br /> 65-day period immediately preceding the date when construction is proposed to <br /> commence. A log of the results of sea turtle monitoring and recovery activities shall be kept and a <br /> copy submitted upon request to the Chief. Environmental Branch, Jacksonville District, U.S. Army <br /> Corp of Engineers, and the Area Engineer, North Florida Area Office, U.S. Army Corps of <br /> Engineers. A marine turtle nesting summary report form shall be used for this purpose. <br /> Page 4 of 7 <br /> Use Agreement U-0354 <br />