My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2009-146
CBCC
>
Official Documents
>
2000's
>
2009
>
2009-146
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/9/2016 9:25:12 AM
Creation date
10/1/2015 3:35:11 AM
Metadata
Fields
Template:
Official Documents
Official Document Type
Work Order
Approved Date
06/02/2009
Control Number
2009-146
Agenda Item Number
12.I.1
Entity Name
Morgan and Eklund Inc.
Subject
Work Order No.5 Sector 3 Beach Restoration Project
Public Works/Coastal Engineering
Erosion Control Line Survey
Area
Sector 3 Beach
Project Number
07252007-2009
Supplemental fields
SmeadsoftID
10653
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
5
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Project : <br /> Sector 3 Beach Restoration Project <br /> Establishment of the Erosion Control Line Survey <br /> WORK ORDER NO . 5 <br /> ( Public Works/Coastal Engineering ) <br /> TO <br /> PROFESSIONAL SERVICES AGREEMENT <br /> ANNUAL SURVEYING and MAPPING/GIS SERVICES <br /> WITH <br /> Morgan and Eklund , Inc. <br /> In accordance with Contract No . 0725 2007-2009 <br /> This Work Order No . 5 is in accordance with the existing AGREEMENT dated November 6'h , 2007 <br /> between Morgan and Eklund , Inc . (SURVEYOR) and Indian River County (COUNTY) . This Work <br /> Order No . 5 amends the Agreement as follows : <br /> SECTION I — PROJECT LIMITS <br /> This Work Order No . 5 is for the SURVEYOR to perform Surveying and Mapping Services necessary <br /> to establish an Erosion Control Line within the Sector 3 Beach Restoration Project area ( FDEP <br /> Reference Monuments R-20 to R-55 , 6 . 6 miles) . Services shall include field and office Surveying and <br /> Mapping services in connection with the Florida Department of Environmental Protection ( FDEP) final <br /> acceptance of the ECL survey . Limits include all properties associated with the project area . <br /> SECTION II = SCOPE OF SERVICES <br /> As agreed upon between Morgan and Eklund , Inc. and Indian River County , the SURVEYOR shall <br /> provide Professional Land Surveying services (Services) as follows : <br /> (A , ) Project planning , coordinate with FDEP ; ( B. ) Field survey (trace Mean High Water Line) ; (C . ) <br /> Obtain and plot property owners along proposed Erosion Control Line on FDEP aerial images ; ( D . ) <br /> Plot Mean High Water Line and prepare legal description , cover sheet, and signature blocks ; and ( E . ) <br /> Coordinate with FDEP during review and acceptance . The complete proposal for the above Services <br /> can be seen in Exhibit A to this Work Order. <br /> SECTION III — TIME FOR COMPLETION & DELIVERABLESMORK PRODUCT <br /> 1 . Completion and Deliverables : <br /> a . "Services" project completion shall be within 30 calendar days of Notice to Proceed . <br /> b . Following completion of the "Services" ; Time for Completion and Deliverables shall be <br /> within 30 calendar days . <br /> c. Prepare maps , documents and supporting files in a way that the COUNTY or other <br /> consultants can readily use it for the design and analysis of the area , as defined . It is <br /> acknowledged all final products become property of Indian River COUNTY and will be <br /> available for use by the public at large . <br /> d . The SURVEYOR' S work product shall meet or exceed the minimum standards as <br /> defined by Sections II , III and IV or the COUNTY will not approve the <br /> SURVEYOR' S request for payment . <br />
The URL can be used to link to this page
Your browser does not support the video tag.