My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2009-047
CBCC
>
Official Documents
>
2000's
>
2009
>
2009-047
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/2/2016 1:49:50 PM
Creation date
10/1/2015 3:17:00 AM
Metadata
Fields
Template:
Official Documents
Official Document Type
Work Order
Approved Date
02/17/2009
Control Number
2009-047
Agenda Item Number
12.I.1
Entity Name
Applied Technology and Management
Subject
Work Order No.15 Sector 7 Beach Restoration
Post Construction Monitoring
Area
Sector 7
Supplemental fields
SmeadsoftID
10461
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
11
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
offshore . For seasonal comparisons and analyses , project site and control site will be pooled . The <br /> Spring 2009 event and final reporting will fulfill the required monitoring . <br /> Task 3 Aerial Photography <br /> This task allows for the collection , rectification and geo- referencing of orthogonal aerial <br /> photography from R-94 through R- 112 per the DEP- approved Physical Monitoring Plan <br /> (September 1 , 2006) . To provide the County with reduced costs , aerial photographs collected <br /> under this work order are considered as an add-on to the DEP- required aerial photography for <br /> physical monitoring Sectors 1 & 2 (Work Order 11 ) ; thus , reconnaissance flights are not included <br /> in this scope . When the aerial photographs for Sectors 1 & 2 are collected , Sector 7 photographs <br /> will be subsequently acquired during the same flight . <br /> ATM will provide the County with a set of aerial photographs and digital copies (with world files) of <br /> the aerials in TIF and JPG format . <br /> Task 4 Beach Tilling and Escarpment Leveling <br /> Sunshine Land Design will perform beach tilling and escarpment leveling . Based on the sand <br /> compaction measurements and escarpment formation observations provided by County staff (by <br /> February 15t) , Sunshine Land Design will till the beach to a depth of 36 inches (Prior to March 1 �t) <br /> and level any escarpment as necessary (prior to April 15t) . This task is limited to a single effort . <br /> Task 5 Beach Profile Survey <br /> Morgan & Eklund will perform the beach profile survey data collection and data reduction . Beach <br /> profiles will include R- 94 through R- 112 including half stations from R-99 to R- 101 and from R- 106 <br /> to R- 108 and quarterly stations between R- 101 and R- 106 . All data collected will be accordance <br /> with the DEP-approved Physical Monitoring Plan . ATM will review the provide necessary project <br /> coordination with the Morgan & Eklund , provide the County with beach profile data in ASCII file <br /> format , CAD drawings , and drawings ( 11x17 format) signed by the surveyor. <br /> Task 6 Physical Monitoring Report <br /> ATM will analyze the data and prepare a physical monitoring report per the DEP-approved <br /> Physical Monitoring Plan . The report will include reporting of the pre-and post- construction <br /> surveys of the beach profiles and borrow site . ATM will analyze the data for placed sand <br />, <br /> shoreline and volume changes and the post- project condition of the borrow site . ATM will provide <br /> the FDEP with aerial photography (rectified and geo-referenced under a separate work order) . <br /> ATM will prepare the 2-Year Post-Construction Physical Monitoring Report as necessary . The <br /> County will provide ATM with comments to a draft version , and ATM will distribute the report as <br /> necessary . <br /> ATM will provide the County with one draft report for review , and distribute final copies to <br /> the <br /> County and regulatory agencies . <br /> Task 7 Agency Coordination and Project Administration <br /> Under this task, ATM will coordinate with federal and state regulatory agencies on key project <br /> issues and overall satisfaction of permit- required submittals . Quality control and quality <br /> assurance will ensure that all submittals and agency coordination meet ATM ' s and the County' s <br /> standards for reporting . All documents will be peer- reviewed internally by ATM staff, and provided <br /> to the County for comment. <br />
The URL can be used to link to this page
Your browser does not support the video tag.