My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2007-403
CBCC
>
Official Documents
>
2000's
>
2007
>
2007-403
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/28/2016 1:06:00 PM
Creation date
9/30/2015 11:28:31 PM
Metadata
Fields
Template:
Official Documents
Official Document Type
Contract
Approved Date
11/20/2007
Control Number
2007-403
Agenda Item Number
11.J.2
Entity Name
Sheltra and Sons Construction
Subject
Master Planned Water Transmission Main
Area
Vero Lakes Estates
Project Number
UCP 2958
Bid Number
2008015
Supplemental fields
SmeadsoftID
6699
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
158
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Section 02000 <br /> WATER AND WASTEWATER UTILITY STANDARDS <br /> PART1 -- GENERAL <br /> 1 . 01 REQUIREMENTS INCLUDED <br /> A. Obtain a copy of utility standards and keep at job site , bearing the <br /> title " I . R . C . D . U . S . Water and Wastewater Utility Standards" , <br /> September 2004 or latest version — herein after called "Reference <br /> Specifications' <br /> B . Installation of all water and wastewater utility facilitiesfinfrastructure <br /> shall be in accordance with the reference standards , drawings and <br /> other specifications in "Division 2 — Site Work . <br /> 1 . 02 RELATED REQUIREMENTS <br /> A. In other parts of the contract documents ; contractor is required to <br /> obtain a copy of the reference specifications , and during <br /> construction , comply with the reference specifications . <br /> 1 . Section 00020 Advertisement for Bids <br /> 2 . Section 00100 Instruction to Bidders <br /> 3 . Section 00310 Bid Form <br /> B . Specified in other sections : <br /> 1 . Section 00530 EJCDC — Agreement between owner <br /> and contractor; article 8 . Contract documents ; paragraph 8 . 6 <br /> 2 . Section 00800 Supplementary conditions ; paragraph <br /> SC — 3 . 03 . B . 2 Coordination of plans , specifications and <br /> special provisions . <br /> 02000- 1 <br />
The URL can be used to link to this page
Your browser does not support the video tag.