My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2007-403
CBCC
>
Official Documents
>
2000's
>
2007
>
2007-403
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/28/2016 1:06:00 PM
Creation date
9/30/2015 11:28:31 PM
Metadata
Fields
Template:
Official Documents
Official Document Type
Contract
Approved Date
11/20/2007
Control Number
2007-403
Agenda Item Number
11.J.2
Entity Name
Sheltra and Sons Construction
Subject
Master Planned Water Transmission Main
Area
Vero Lakes Estates
Project Number
UCP 2958
Bid Number
2008015
Supplemental fields
SmeadsoftID
6699
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
158
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
2 . Hardwood (all species except pine ): An application of asphalt-type tree <br /> pruning paint shall be applied to the damaged area . The paint shall be <br /> applied in sufficient quantity so as to form an airtight seal . Spraying or <br /> painting of the damaged trees shall be performed within twenty-four (24 ) <br /> hours after the injury occurs . In case of damage to "specimen" <br /> hardwoods , the inspecting Engineer may require the Contractor to retain <br /> a skilled and licensed tree surgeon to properly treat the damaged tree . <br /> No compensation shall be made to the Contractor for treating damaged <br /> trees . <br /> PART 3 -- EXECUTION <br /> 3.01 GENERAL <br /> Protect tree root system from damage due to noxious materials in solution <br /> caused by run-off or spoilage during mixing and placement of construction <br /> materials , or drainage from stored materials . Protect root systems from flooding , <br /> erosion , or excessive wetting resulting from dewatering operations . <br /> 3 .02 REPAIR AND REPLACEMENT OF TREES <br /> A . Repair trees damaged by construction operations , in a manner <br /> acceptable to the Engineer. Make repairs promptly after damage occurs <br /> to prevent progressive deterioration of damaged trees . <br /> B . Remove and replace dead and damaged trees which are determined by <br /> the tree surgeon to be incapable of restoration to normal growth pattern . <br /> C . If trees over six inches in caliper measurement (taken 12 inches above <br /> grade) are required to be replaced , provide new trees of six inches caliper <br /> size , and of the species selected by the Engineer. <br /> 3 . 03 DISPOSAL <br /> Removal from Owner's property: Remove excess excavation , displaced trees , <br /> and trimmings, and dispose of off the Owner's property in a manner approved by <br /> local agencies . <br /> '* END OF SECTION " <br /> 02115 Tree Protection and Drilling.doc <br /> 02115 - 2 <br /> JaO7-029 12 1nch W M - Vero Lake Estates\oawments\Reports\eidding contract Speaficalioro;M 15 Tree Protection and Orilling.doc <br />
The URL can be used to link to this page
Your browser does not support the video tag.