Laserfiche WebLink
300-6. Prime <br />shall be applied <br />at the rate of 0.50 gallon per square <br />yard, or <br />as directed by <br />the Engineer. <br />B. Arterial Streets: In arterial streets, the Contractor shall, after completion and <br />acceptance of the backfill, construct a base course in accordance with the <br />typical section. Upon completion of the base course, the Contractor shall <br />construct an asphaltic concrete surface course, Type II, in accordance with <br />FDOT Specifications, Section 332, Articles 332-1 through 332-5. The top of <br />the surface course shall be constructed flush with the adjacent asphalt <br />surface. Thickness of the replaced course shall match the thickness of the <br />existing surface course. <br />3.05 EMERGENCY REPAIRS AND PROCEDURES <br />The Contractor shall provide the name and telephone number of at least two <br />persons designated by the Contractor to receive notification of the need for <br />emergency repairs. These persons shall be available for emergency notification on <br />a 24 hour basis. The County will provide the name, or names, of its designee who <br />will be charged with giving notice to the Contractor when the need for emergency <br />repairs, or other actions, is necessary on work that has been performed by the <br />Contractor. When so notified by the person so designated by the County that <br />emergency repairs, or other actions, are necessary the Contractor will be given a <br />reasonable time to respond to the situation. At the time of notification the Contractor <br />will give the time that he will be able to take action to rectify the emergency <br />conditions. If this time is not satisfactory to the County, the County reserves the <br />right to have the Road & Bridge Division make necessary repairs, or take other <br />emergency actions as required to restore the pavement, or take other actions <br />necessary. The County will invoice the Contractor for the actual time and materials <br />used in executing the emergency repairs or actions. This amount will be based <br />upon hourly rates and actual materials cost to the County. The labor rates will be <br />supplied to the Contractor prior to beginning work under this Contract. If the <br />Contractor does not pay the invoice as presented by the County, the County <br />reserves the right to withhold that amount from the Contractor on the Final Pay for <br />this Contract. <br />3.06 SIDEWALK, CONCRETE DRIVEWAY, CURB, AND COMBINED <br />GUTTER REMOVAL AND REPLACEMENT <br />A. SURFACE PREPARATION: <br />1. Remove loose material from the compacted subbase surface <br />immediately before placing concrete. <br />2. Proof -roll prepared subbase surface to check for unstable areas and <br />the need for additional compaction. Do not begin paving work until <br />such conditions have been corrected and are ready to receive <br />paving. Comply with requirements of FDOT Section 230, Paragraph <br />230-6. <br />B. Do not place concrete until subbase and forms have been checked for line <br />and grade. Moisten if required to provide a uniform dampened condition at <br />02576 Pavement, Sidewalk, and Driveway Replacement.doc <br />DYbi[:II.7 <br />Ji97-029 t2 Inch WM -Vem Lake EstatesZocoments\Reports\Bidding Contract SpecificationsW25713 Pavement, Sidewalk, and Dnveway Replacementdoc <br />