Laserfiche WebLink
D. CURING: <br />Protect and cure finished concrete paving and walks, as required. Use <br />moist -curing methods for initial curing whenever possible of approved <br />concrete curing compounds. <br />E. REPAIRS AND PROTECTION: <br />1. Repair or replace broken or defective concrete, as directed by <br />Engineer. <br />2. Drill test cores where directed by Engineer, when necessary to <br />determine magnitude of cracks or defective areas. Fill drilled core <br />holes in satisfactory pavement areas with Portland cement concrete <br />bonded to pavement with epoxy resin grout. <br />3. Protect concrete from damage until acceptance of work. When <br />construction traffic is permitted, maintain pavement as clean as <br />possible by removing surface stains and spillage of materials as <br />they occur. <br />4. Sweep concrete pavement and wash free of stains and <br />discoloration, dirt, and other foreign material just prior to final <br />inspection. <br />** END OF SECTION ** <br />02576 Pavement Sidewalk and Driveway Replacement.doc <br />02576-8 <br />CADecuments and SettingslwSALocal SettmgslTemporary Internet Files10LK%%Q2576 Pavement Sidewalk and Driveway Replacement,doc <br />