Laserfiche WebLink
This document has important legal consequences; consultation with an attorney is encouraged with respect <br />to its use or modification. This document should be adapted to the particular circumstances of the <br />contemplated Project and the Controlling Law. <br />STANDARD <br />GENERAL CONDITIONS <br />OF THE <br />CONSTRUCTION CONTRACT <br />Prepared by <br />ENGINEERS JOINT CONTRACT DOCUMENTS COMMITTEE <br />and <br />Issued and Published Jointly By <br />[INSERT LOGOS] <br />PROFESSIONAL ENGINEERS IN PRIVATE PRACTICE <br />a practice division of the <br />NATIONAL SOCIETY OF PROFESSIONAL ENGINEERS <br />AMERICAN CONSULTING ENGINEERS COUNCIL <br />AMERICAN SOCIETY OF CIVIL ENGINEERS <br />This document has been approved and endorsed by <br />The Associated General [seal] Contractors of America <br />Construction Specifications Institute <br />[seal] <br />These General Conditions have been prepared for use with the Owner -Contractor Agreements (No. 1910-8-A-1 <br />or 1910-8-A-2) (1996 Editions). Their provisions are interrelated and a change in one may necessitate a <br />change in the other. Comments concerning their usage are contained in the EJCDC User's Guide (No. 1910- <br />50). For guidance in the preparation of Supplementary Conditions, see Guide to the Preparation of <br />Supplementary Conditions (No. 1910-17) (1996 Edition). <br />EJCDC No. 1910-8 (1996 Edition) <br />Copyright ©1996 <br />National Society of Professional Engineers <br />1420 King Street, Alexandria, VA 22314 <br />American Consulting Engineers Council <br />101515th Street N.W., Washington, DC 20005 <br />American Society of Civil Engineers <br />345 East 47th Street, New York, NY 10017 <br />