Laserfiche WebLink
sufficiently similar so that no change in related Work will <br />be required, it may be considered by ENGINEER as an <br />6.03 Services, Materials, and Equipment <br />"or -equal" item, in which case review and approval of <br />the proposed item may, in ENGINEER's sole discretion, <br />A. Unless otherwise specified in the General Re- <br />be accomplished without compliance with some or all of <br />quirements, CONTRACTOR shall provide and assume full <br />the requirements for approval of proposed substitute <br />responsibility for all services, materials, equipment, labor, <br />items. For the purposes of this paragraph 6.05.A.1, a <br />transportation, construction equipment and machinery, tools, <br />proposed item of material or equipment will be <br />appliances, fuel, power, light, heat, telephone, water, sanitary <br />considered functionally equal to an item so named if: <br />facilities, temporary facilities, and all other facilities and <br />incidentals necessary for the performance, testing, start-up, and <br />a. in the exercise of reasonable judgment <br />completion of the Work. <br />ENGINEER determines that: (i) it is at least equal in <br />quality, durability, appearance, strength, and design <br />B. All materials and equipment incorporated into the <br />characteristics; (ii) it will reliably perform at least <br />Work shall be as specified or, if not specified, shall be of good <br />equally well the function imposed by the design <br />quality and new, except as otherwise provided in the Contract <br />concept of the completed Project as a functioning <br />Documents. All warranties and guarantees specifically called <br />whole, and; <br />for by the Specifications shall expressly run to the benefit of <br />OWNER. If required by ENGINEER, CONTRACTOR shall <br />b. CONTRACTOR certifies that: (i) there is no <br />furnish satisfactory evidence (including reports of required tests) <br />increase in cost to the OWNER; and (ii) it will <br />as to the source, kind, and quality of materials and equipment. <br />conform substantially, even with deviations, to the <br />All materials and equipment shall be stored, applied, installed, <br />detailed requirements of the item named in the <br />connected, erected, protected, used, cleaned, and conditioned <br />Contract Documents. <br />in accordance with instructions of the applicable Supplier, <br />except as otherwise may be provided in the Contract Docu- <br />2.Substitute Items <br />ments. <br />a. If in ENGINEER's sole discretion an item of <br />6.04 Progress Schedule <br />material or equipment proposed by CONTRACTOR <br />does not qualify as an "or -equal" item under <br />A. CONTRACTOR shall adhere to the progress <br />paragraph 6.05.A.1, it will be considered a proposed <br />schedule established in accordance with paragraph 2.07 as it <br />substitute item. <br />may be adjusted from time to time as provided below. <br />b. CONTRACTOR shall submit sufficient infor- <br />1.CONTRACTOR shall submit to ENGINEER for <br />mation as provided below to allow ENGINEER to <br />acceptance (to the extent indicated in paragraph 2.07) <br />determine that the item of material or equipment <br />proposed adjustments in the progress schedule that will <br />proposed is essentially equivalent to that named <br />not result in changing the Contract Times (or <br />and an acceptable substitute therefore. Requests <br />Milestones). Such adjustments will conform generally to <br />for review of proposed substitute items of material <br />the progress schedule then in effect and additionally will <br />or equipment will not be accepted by ENGINEER <br />comply with any provisions of the General Re- <br />from anyone other than CONTRACTOR. <br />quirements applicable thereto. <br />c. The procedure for review by ENGINEER <br />2.Proposed adjustments in the progress schedule <br />will be as set -forth in paragraph 6.05.A.2.d, as <br />that will change the Contract Times (or Milestones) shall <br />supplemented in the General Requirements and as <br />be submitted in accordance with the requirements of <br />ENGINEER may decide is appropriate under the <br />Article 12. Such adjustments may only be made by a <br />circumstances. <br />Change Order or Written Amendment in accordance <br />with Article 12. <br />d. CONTRACTOR shall first make written <br />application to ENGINEER for review of a proposed <br />6.05 Substitutes and "Or -Equals" <br />substitute item of material or equipment that <br />CONTRACTOR seeks to furnish or use. The <br />A. Whenever an item of material or equipment is <br />application shall certify that the proposed substitute <br />specified or described in the Contract Documents by using the <br />item will perform adequately the functions and <br />name of a proprietary item or the name of a particular Supplier, <br />achieve the results called for by the general design, <br />the specification or description is intended to establish the type, <br />be similar in substance to that specified, and be <br />function, appearance, and quality required. Unless the <br />suited to the same use as that specified. The appli- <br />specification or description contains or is followed by words <br />cation will state the extent, if any, to which the use of <br />reading that no like, equivalent, or "or -equal" item or no <br />the proposed substitute item will prejudice <br />substitution is permitted, other items of material or equipment or <br />CONTRACTOR's achievement of Substantial <br />material or equipment of other Suppliers may be submitted to <br />Completion on time, whether or not use of the <br />ENGINEER for review under the circumstances described <br />proposed substitute item in the Work will require a <br />below. <br />change in any of the Contract Documents (or in the <br />provisions of any other direct contract with OWNER <br />1."Or-Equal" Items: If in ENGINEER's sole discre- <br />for work on the Project) to adapt the design to the <br />tion an item of material or equipment proposed by CON- <br />proposed substitute item and whether or not <br />TRACTOR is functionally equal to that named and <br />incorporation or use of the proposed substitute item <br />00700 General Conditions (E1CDC).doc <br />00700- 16 <br />I WI-02912Inch WM - Vero lake Slnecl5catlonsr00700 General Conditions <br />(E1CDQ.doc <br />